Articles – page 135

9402 articles
Neighbours, Objections and Community6 min read

Objections that arrive after the consultation period

The twenty-one day period is a publicity minimum, not a deadline for representations. Where the effective cut-off actually falls for delegated and committee decisions, and how to get a late point read.

Read article →
Viability, Obligations and Commercial7 min read

Indexation clauses in planning obligations

Indexation is agreed without argument and disputed at payment. The four drafting defects that cause it, and the five-step check to run before transferring a contribution.

Read article →
Fire, Structural and Basements7 min read

Basement lightwells and neighbour amenity

A front lightwell on a house fronting a highway falls outside householder permitted development. What officers look at, and the four constraints that fix the size before design begins.

Read article →
Daylight, Sunlight and Amenity7 min read

Trees, daylight and the assessment nobody agrees on

A tree blocking light is usually outside the planning system altogether. The four routes that do exist, what each can achieve, and why daylight assessments report results with and without trees.

Read article →
Energy, Sustainability and Carbon7 min read

Cooling hierarchy evidence for a south facing flat

Officers test the cooling hierarchy by reading model inputs, not conclusions. An iteration table showing what each measure achieved is what carries a single aspect south facing flat through review.

Read article →
Refusals and Appeals7 min read

Prior approval refusals and the limited scope of appeal

Design, amenity space and housing mix are not prescribed matters under Class MA, so a refusal citing them is vulnerable. How to decide between appealing and resubmitting within another 56 days.

Read article →
Neighbours, Objections and Community7 min read

Amended plans and when the council must consult again

Revised drawings do not automatically generate a second consultation. The fairness tests authorities apply, how to spot an amendment on the register, and what to put in a second letter.

Read article →
Viability, Obligations and Commercial7 min read

Land value expectations and viability circularity in plans

Policy requirements are set on policy-compliant land value assumptions, but land bought under the previous plan keeps arriving for years afterwards. How that lag plays out in viability evidence.

Read article →
Fire, Structural and Basements7 min read

Ground gas risk and protection measures in conditions

Ground gas conditions cost little to agree and a great deal to discharge late. The sequence from monitoring rounds to a verified protection system, and the four programming failures that cause delay.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight assessments at appeal: what inspectors test

Appeal decisions on daylight turn on model inputs, honest reporting and the weight given to each affected room. How to set an alternative target value and survive cross-examination on it.

Read article →
Energy, Sustainability and Carbon6 min read

Unregulated energy and why planning policy excludes it

Cooking, appliances, lifts and catering sit outside the Part L compliance calculation. Energy statements in London have to report them anyway, and a growing number of adopted plans ask for a total figure.

Read article →
Refusals and Appeals7 min read

Planning permission refused: what to do next

A refusal notice has to give full reasons. Sorting those reasons into scheme problems and evidence problems tells you whether to amend, resubmit free of fee or appeal, and how long you have to act.

Read article →
Fire, Structural and Basements7 min read

Geotechnical assessment on a sloping site

Slope turns a bearing capacity question into a stability question. The investigation has to cover ground you are not building on, and the drainage strategy becomes a stability measure.

Read article →
Daylight, Sunlight and Amenity7 min read

Sunlight to a north facing garden

A garden on the north side of a house sits in its own shadow, so the absolute sun on ground test is often failed before anything is built. The case then turns on how much of the remaining sunlit area a proposal removes.

Read article →
Energy, Sustainability and Carbon6 min read

Carbon offset shortfall calculations and fund rates

Offset payments are calculated on residual regulated emissions, not on the gap against an on-site reduction target. Check the inputs, fix the rate at the right date, and watch for double indexation.

Read article →
Refusals and Appeals7 min read

Appealing a householder refusal on the fast track

The householder appeals service runs on a 12 week deadline and an expedited written procedure. No later statements, no new drawings, and neighbours cannot write again to the inspector.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight in deep plan flats with a single window

A side-lit room goes dark at the rear once depth outruns head height. The fixes that work are reducing depth and adding a second aspect, not widening the window.

Read article →
Energy, Sustainability and Carbon6 min read

Substitution rate assumptions in a circular economy statement

A reuse percentage means nothing without the specification clause that delivers it. Separate on-site reuse from diversion, report recycled content by stream, and calculate every figure from a pre-redevelopment audit.

Read article →
Fire, Structural and Basements7 min read

Structural condition and the Class Q barn test

The rebuilding limitation in Class Q decides most barn conversion refusals. A structural appraisal must conclude that conversion is achievable, with every work item mapped to an operation the Order allows.

Read article →
Viability, Obligations and Commercial7 min read

The three statutory tests for a planning obligation

The three tests in regulation 122 are statutory restrictions rather than policy to be weighed. Agreeing to an unnecessary contribution does not cure the failure, and an inspector will apply the tests directly.

Read article →
Daylight, Sunlight and Amenity7 min read

Amenity conditions on plant near bedroom windows

A condition limiting plant rating level at the nearest sensitive facade binds whatever the supplier promised. Design to the night time background, isolate the vibration path, and offer measurable condition wording yourself.

Read article →
Energy, Sustainability and Carbon6 min read

Reporting modules C and D in a carbon assessment

End of life modules rest on disposal scenarios nobody can verify, and module D credits belong outside the total. State the scenario, keep reuse claims in one place, and label the module D line.

Read article →
Fire, Structural and Basements7 min read

Underpinning a neighbouring property: the consents needed

Strengthening a neighbour's foundations usually needs no planning permission. What it does need is a party wall notice with the method attached, building control approval, and compliance with any conditioned method statement.

Read article →
Viability, Obligations and Commercial7 min read

Pooling restrictions and how obligations are now structured

Section 106 contributions are no longer capped by number and regulation 123 lists have gone. What remains is regulation 122: necessary, directly related, and fairly and reasonably related in scale and kind.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope