Articles – page 158

9360 articles
Trees and Arboriculture8 min read

Tree establishment and defects periods in a condition

A five year tree replacement condition is not a defects period. How to fix the trigger date, keep species substitution open, and allocate the aftercare cost before it surprises you.

Read article →
Heritage and Archaeology8 min read

Cast iron rainwater goods and like for like repair

Repairing cast iron gutters in the same material rarely needs consent. Swapping them for plastic almost always does. How to repair, match profiles and make the case for aluminium.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: rural worker's dwelling on a smallholding

An illustrative walkthrough of an application for a rural worker's dwelling on a 14 hectare holding, from the labour requirement assessment to the agricultural occupancy condition.

Read article →
Residential Scale Thresholds7 min read

The point at which a travel plan replaces a travel statement

A travel plan statement is a one off cost. A full travel plan is a five year monitoring obligation. Where the threshold sits, what monitoring involves, and what to resist in the drafting.

Read article →
Report Deep Dives7 min read

Recommending further survey in an ecological appraisal

The further survey section of a Preliminary Ecological Appraisal decides your programme. How suitability scoring drives survey effort, which seasons bind, and what a council can condition.

Read article →
Householder Extensions and Conversions7 min read

Annexes and the single planning unit question

An annexe needs permission when it creates a separate dwelling. The planning unit factors officers weigh, why Class E rarely covers a garden annexe, and the conditions to expect.

Read article →
Fire, Structural and Basements7 min read

Piling methods beside sensitive neighbours

Piling method is a planning issue. How to predict noise and vibration to BS 5228, set trigger levels people will accept, and use section 61 prior consent to lock in hours and methods.

Read article →
Noise, Air, Odour and Light7 min read

Plant noise limits expressed as a condition

A plant noise condition needs a place, a period and a metric. How to convert a relative limit into a number, cover cumulative plant, and keep defrost cycles out of breach.

Read article →
Trees and Arboriculture8 min read

Retaining a tree above a basement or piled foundation

Retaining a tree above a basement starts with the root protection area, not the structural grid. Root investigation, pile offsets, cantilevered slabs and the groundwater effects that show up years later.

Read article →
Heritage and Archaeology7 min read

Historic paint analysis and specifying redecoration

Paint analysis gives you layers, not appearances. How to sample a listed interior, read a stratigraphy honestly, and specify a redecoration that will not blister off the lime plaster.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: rooftop plant enclosure on an office building

An illustrative walkthrough of replacing chillers and air handling units on an office roof, from the section 55 question through BS 4142 noise assessment to the commissioning condition.

Read article →
Residential Scale Thresholds7 min read

When a scheme becomes referable to the Mayor of London

More than 150 homes makes a London scheme referable, and floorspace, height and Metropolitan Open Land triggers catch others. Here is what Stage 1 and Stage 2 actually involve.

Read article →
Report Deep Dives7 min read

The access and visibility section of a Transport Statement

The access section of a Transport Statement lives or dies on the speed survey. Here is how to set X and Y distances, show gradients and turning, and deal with splays over land you do not own.

Read article →
Householder Extensions and Conversions8 min read

Rear dormers on a semi detached house: the rules

A rear dormer on a semi detached house usually falls under Class B permitted development, but only if it stays below the ridge, keeps 0.2 metres back from the eaves and adds no more than 50 cubic metres.

Read article →
Noise, Air, Odour and Light7 min read

Validation monitoring conditions for noise and air quality

Post-completion testing conditions test outcomes rather than intentions, which makes them valuable and easy to draft badly. Eight elements make one enforceable.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: replacement dwelling in the Green Belt

An illustrative walkthrough of a Green Belt replacement dwelling, from establishing the lawful baseline and the volume comparison to openness, bats and the conditions to expect.

Read article →
Residential Scale Thresholds7 min read

Phasing a scheme and when each threshold bites

Major status and EIA screening look at the whole project. Levy liability, gain plans and most conditions can work phase by phase, but only if the permission is drafted for it.

Read article →
Householder Extensions and Conversions7 min read

Obscure glazing conditions on side facing windows

Obscure glass alone does not satisfy the condition. The window also has to be fixed shut below 1.7 metres, and an open casement overlooks just as well as a clear one.

Read article →
Noise, Air, Odour and Light7 min read

Railway vibration and the thresholds that apply

Groundborne vibration is felt and reradiated noise is heard, and they need separate assessment. Base isolation is a concept design decision, not a late addition.

Read article →
Trees and Arboriculture7 min read

Transplanting a mature tree as mitigation

Tree officers read most transplant offers as felling applications with extra steps. What changes that is a survival assessment, a real preparation programme and a replacement obligation.

Read article →
Heritage and Archaeology7 min read

Grade I and II star cases and the notification duty

A higher grade listed building consent is more than a harder argument. Notification to Historic England, the amenity societies and sometimes the Secretary of State changes the programme.

Read article →
Residential Scale Thresholds7 min read

Site area: what to include inside the red line

Too tight and the access works are unauthorised. Too loose and you have bought major status, a flood risk assessment and a bigger biodiversity obligation.

Read article →
Fire, Structural and Basements7 min read

Asbestos surveys before demolition and what conditions cover

Regulation 5 already requires an intrusive survey before demolition. A condition restating it fails the tests for planning conditions, while dust, hours and sequencing are fair game.

Read article →
Noise, Air, Odour and Light7 min read

Acoustic glazing, ventilation and the overheating conflict

On a noisy site the acoustician assumes windows shut and the overheating modeller assumes them open. Both reports pass and the building fails. One strategy, issued first, prevents it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope