Articles – page 212

9229 articles
Scenario Walkthroughs7 min read

A barn conversion where the structural evidence failed

Class Q permits conversion, not rebuilding. An illustrative prior approval refused because the drawings showed new foundations and a structural inner leaf.

Read article →
Costs, Fees and Budgeting7 min read

The cost of a pre-commencement condition you cannot discharge

The fee is the smallest part. Finance on a stalled site, a lost survey season and a permission that never lawfully began are what a pre-commencement condition really costs.

Read article →
Project Type Guides7 min read

Extending a special educational needs school

Specialist school expansions turn on playing field loss and drop-off capacity, not on general education policy. Mainstream school trip rates give the wrong answer.

Read article →
Constraints and Designations6 min read

Conservation area appraisals and the weight they carry

An appraisal tells the decision maker what the character of a conservation area is. Read it as a design brief rather than a list of prohibitions, and quote it back.

Read article →
Professionals and Qualifications6 min read

Briefing an ecologist before the survey season

Most ecology survey windows are short and several close by the end of June. Commission the appraisal between October and February and the whole season is yours.

Read article →
Permitted Development7 min read

Permitted development and building regulations compared

An extension can be permitted development and still unlawful for want of building control. What each regime tests, which Approved Documents bite, and the order to do things in.

Read article →
Scenario Walkthroughs7 min read

A rear extension refused on daylight, then approved

Refused on loss of light, approved four months later. The illustrative case turned on 800 mm of depth, a lowered eaves and a 700 mm set-in from the boundary.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a viability assessment and its review mechanism

The appraisal is the smallest line. Benchmark land value evidence, the authority's independent review and months of negotiation are where a viability case really costs.

Read article →
Project Type Guides7 min read

An off-road motorsport track on private land

Motor sport gets 14 of the 28 permitted temporary use days, and none of them cover track construction. What a full application needs and how the conditions are drafted.

Read article →
Professionals and Qualifications7 min read

Signing off an AI drafted report as the named author

Sign a machine drafted report and you are its author for every professional purpose. Here is the review method, the scope statement and the grounds for declining.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a licensing application alongside planning

A representation under the Licensing Act 2003 has to engage one of four objectives. A planning objection has to engage a material consideration. Here is how to run both.

Read article →
Constraints and Designations7 min read

Nutrient neutrality: what evidence a catchment scheme needs

Nutrient neutrality is a Habitats Regulations problem, not a drainage one. What goes into a nutrient budget, how mitigation is secured, and what to check before buying credits.

Read article →
Use Classes and Change of Use6 min read

Veterinary, medical and health uses in a residential street

Medical and health services sit in Class E(e), so movements inside Class E need no permission. Veterinary use is murkier, and overnight animals change everything.

Read article →
Permitted Development7 min read

Article 3(5), limitations and conditions in the GPDO

Breaching a condition of a permitted development class does not leave you with a condition breach. It leaves you with unauthorised development. Here is why, and what article 3(5) adds.

Read article →
Scenario Walkthroughs7 min read

Converting a village pub to two dwellings: the full pack

Pub conversions turn on marketing evidence and community facility policy, not on design. An illustrative walkthrough of a village pub becoming two houses, document by document.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting a party wall award alongside an extension

The Party Wall etc. Act 1996 is a civil regime your council will never mention. Here is what it covers, who pays the surveyors and how the notice periods shape a build programme.

Read article →
Project Type Guides7 min read

A single wind turbine on a farm holding

A single turbine on a farm is a full planning application decided on noise, shadow flicker, aviation safeguarding and landscape. Here is what each of those needs and in what order.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme in a Source Protection Zone

A groundwater Source Protection Zone restricts infiltration drainage and penetrative foundations. Here is the document set that answers the Environment Agency before it objects.

Read article →
Glossary7 min read

Chargeable development: what CIL is calculated on

The Community Infrastructure Levy is calculated on new gross internal area, less the floorspace of buildings that pass the in-use test. Here is how the measurement, the deductions and the liability notice actually work.

Read article →
Templates, Checklists and Examples6 min read

Section outline: health impact assessment for 200 units

A working section outline for a health impact assessment on a major residential scheme, written so a case officer can lift the findings straight into a committee report.

Read article →
Which Reports Do I Need7 min read

Documents for a swimming pool building in a rear garden

An enclosed pool building is an outbuilding under Class E, and most refusals turn on height, curtilage coverage or plant noise. Here is what to check and what to submit.

Read article →
Glossary7 min read

Saved policy: why old local plan policies still apply

A saved policy carries full statutory force until it is replaced. What varies is weight, not status. Here is how to check what is saved and how to argue that a policy is out of date.

Read article →
Neighbours, Objections and Community7 min read

Rights of light and where they sit outside planning

A right to light is a private property right, not a planning matter. Here is how one is acquired, how it differs from daylight assessment, and what planning permission does not authorise.

Read article →
Constraints and Designations7 min read

Ministry of Defence safeguarding zones in planning

Defence safeguarding zones trigger consultation with the Ministry of Defence on height, lighting, bird attraction and occupancy. Here is how each zone works and what evidence answers it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope