Articles – page 253

9154 articles
Daylight, Sunlight and Amenity6 min read

Daylight and sunlight for schools, nurseries and care homes

BRE guidance is written around dwellings, but classrooms, care home lounges and nursery play space all count as receptors where occupants reasonably expect daylight. The tests are the same and the arguments are different.

Read article →
Constraints and Designations6 min read

Buffer distances in planning and where they come from

Some separation distances are fixed by law, some are advisory minimums from national standing advice and some appear in a local document with no evidence behind them. Knowing which is which changes the argument.

Read article →
Use Classes and Change of Use6 min read

Car showrooms, garages and motor trade planning rules

Most motor trade uses sit outside the Use Classes Order altogether. That single fact drives the consent route, the evidence a council asks for and the conditions that follow.

Read article →
Rural and Agricultural6 min read

Livery yards and the point horses become a business

Grazing horses on farmland can be agriculture. Keeping them, stabling them and charging other people for the privilege is a different planning use. Here is where the line sits and what evidence settles it.

Read article →
Glossary6 min read

National development management policies: what they change

The Levelling-up and Regeneration Act 2023 created a category of national policy that sits inside the statutory decision test and beats a conflicting local plan policy. Here is how the machinery works and what to check before you cite it.

Read article →
Rural and Agricultural6 min read

Farm diversification into workshops and offices

Test the permitted development route first. Prior approval avoids biodiversity net gain and a full consultation, but the floorspace cap applies across the whole agricultural unit.

Read article →
Glossary6 min read

Windfall allowances in housing land supply

The windfall allowance is the only part of a five year supply resting on prediction. The policy test needs a clean historic series and a mechanism that still works.

Read article →
Trees and Arboriculture6 min read

Overhanging branches, roots and protected trees

The common law right to cut back to the boundary is settled. Tree preservation orders and conservation area notice requirements sit on top of it and take precedence.

Read article →
Transport, Highways and Parking6 min read

Using collision data in a transport assessment

Collision analysis is the part of a transport assessment read most closely by objectors. Classify by mechanism rather than by location, and state the limitations.

Read article →
Ecology, BNG and Protected Species6 min read

Hazel dormouse surveys: nest tubes, effort and indices

A dormouse survey is complete when the accumulated index of probability reaches the published threshold, not when the tubes come down. The high-scoring months sit late in the season.

Read article →
Fire, Structural and Basements6 min read

Structural appraisal for converting a former mill

On a mill conversion the structural appraisal sets the layout, not the other way round. Cast iron, beam ends and diaphragm action decide what the plan can be.

Read article →
Daylight, Sunlight and Amenity6 min read

Room use assumptions in a daylight assessment

Daylight guidance weights living rooms above bedrooms, so the assumed use behind each window can move a result from material harm to minor effect.

Read article →
Flood, Drainage and SuDS6 min read

Rainwater harvesting and whether it counts as attenuation

A harvesting tank is designed to be full and an attenuation tank has to be empty. Splitting the vessel is the design that survives a planning condition.

Read article →
Constraints and Designations6 min read

What a commercial constraints search misses

A search report answers what national datasets can answer. Site allocations, minerals safeguarding, local wildlife sites and nutrient neutrality are not among them.

Read article →
Use Classes and Change of Use6 min read

Live music venues and the agent of change principle

Venues for live music performance were left out of Class E in 2020. That classification is what makes agent of change work, and it decides who pays for the acoustic mitigation.

Read article →
Rural and Agricultural6 min read

Camping and caravan use under the 60 day right

The general temporary use right and the recreational campsite right are separate allowances with separate day counts. Records decide enforcement cases, so keep them as you go.

Read article →
Glossary6 min read

Vehicle crossovers and section 184 consent

Section 184 of the Highways Act 1980 governs every vehicle crossing. Whether you also need planning permission turns on whether the road is classified.

Read article →
Trees and Arboriculture6 min read

Specifying crown reduction and pruning works properly

Reduce by 30 per cent cannot be drawn or checked. Specify crown reduction by branch length or final crown dimensions, and give the reason for every operation.

Read article →
Transport, Highways and Parking6 min read

The severe test: when highway impact justifies refusal

Capacity objections are qualified by the word severe. Safety objections are not. Building a highway case means keeping the two apart and making the residual impact concrete.

Read article →
Ecology, BNG and Protected Species6 min read

Bat class licence or individual licence: which route applies

The roost decides the licence route, not the programme. Small day roosts of common species can go through the class licence; maternity roosts and hibernacula cannot.

Read article →
Fire, Structural and Basements6 min read

Geotechnical assessment and Eurocode 7 expectations

Ground investigation at planning stage answers whether the site suits the proposal. Eurocode 7 sets the categories, the design approach and the two reports councils confuse.

Read article →
Daylight, Sunlight and Amenity6 min read

Amenity impact of a rear extension on a terraced house

On a mid-terrace, the projection and height of the extension at the party boundary decide the application. Here is how councils test it and what reduces the impact.

Read article →
Flood, Drainage and SuDS6 min read

Drainage evidence for a single new dwelling

One new house needs a short drainage statement, not a modelled design. Work down the surface water hierarchy with a reason at each step, and include a dated percolation test.

Read article →
Constraints and Designations6 min read

Checking site constraints on the national planning data service

The national planning data service answers a constraints check in minutes, but local layers such as Article 4 directions are published unevenly. A blank map is not a clear site.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope