Articles – page 289

9074 articles
Permitted Development6 min read

How previous extensions count against your allowance

The original dwellinghouse is the house as it stood on 1 July 1948, or as first built. Every enlargement since counts, whoever built it and whatever consent it had.

Read article →
Professionals and Qualifications6 min read

Party wall surveyors and planning: different roles

Planning permission decides whether development is acceptable. The Party Wall etc. Act 1996 decides whether you may build against or excavate near a neighbour structure. Neither replaces the other.

Read article →
Templates, Checklists and Examples6 min read

A householder appeal on the twelve week route

Householder appeals must be lodged within 12 weeks of the decision notice, and nothing can be added afterwards. Everything you rely on goes in with the appeal form.

Read article →
Comparisons6 min read

Schedule 1 against Schedule 2 EIA development

Schedule 1 makes assessment mandatory. Schedule 2 thresholds only decide whether the screening duty arises, and in a sensitive area those thresholds fall away entirely.

Read article →
Project Type Guides6 min read

Planning permission for a film studio in a warehouse

A studio mixes stages, workshops and offices, so no single use class fits. Most councils treat it as sui generis, which makes the condition schedule the document that matters.

Read article →
Which Reports Do I Need6 min read

Documents for extending a listed building

An extension to a listed building needs two consents and a far heavier document set than a standard householder application. The significance assessment sets the scope for everything else.

Read article →
Glossary6 min read

Impact risk zone: the SSSI consultation trigger

Impact risk zones tell a council when to consult Natural England about a site of special scientific interest. The zone restricts nothing by itself, but it changes what your application needs to carry.

Read article →
Heritage and Archaeology6 min read

Applying the setting assessment steps in practice

Most setting assessments skip the step that matters: saying what the surroundings contribute to significance before the proposal is introduced. Here is how to work through all five.

Read article →
Ecology, BNG and Protected Species6 min read

Off-site biodiversity units and statutory credits

Off-site units and statutory credits are the last two tiers of the biodiversity gain hierarchy. Spatial risk multipliers mean the lowest listed price rarely buys the lowest cost per delivered unit.

Read article →
Trees and Arboriculture6 min read

Removing an important hedgerow: the notice procedure

Countryside hedgerow removal runs on a notice, not an application. Serve it, wait 42 days, and check whether the hedgerow meets the Schedule 1 importance test first.

Read article →
Permitted Development6 min read

Designated land and householder permitted development

Designated land does not remove permitted development wholesale. It removes named rights in Part 1: dormers, side extensions, two storey rear extensions, cladding and the larger home extension route.

Read article →
Professionals and Qualifications6 min read

Conflicts of interest for planning consultants

A conflict is manageable if you spot it, disclose it in writing and obtain informed consent before working. Some conflicts cannot be consented away at all.

Read article →
Templates, Checklists and Examples6 min read

A statement of case for a written representations appeal

In a written representations appeal the statement is your entire case. Structure it around the reasons for refusal, attach the evidence, and offer drafted conditions.

Read article →
Comparisons6 min read

EIA screening opinion against a scoping opinion

Screening asks whether your scheme is EIA development. Scoping asks what the environmental statement must address. Different regulations, different deadlines, different submissions.

Read article →
Project Type Guides6 min read

Planning permission for a clay shooting ground

A clay pigeon shooting ground can run for 28 days a year under permitted development, unless the land is in a SSSI. Past that, the application stands or falls on the noise assessment.

Read article →
Which Reports Do I Need7 min read

Which reports a twelve unit scheme adds

Ten dwellings is the major development threshold. A twelve unit scheme picks up affordable housing policy, lead local flood authority consultation, full biodiversity net gain and a 13 week determination period.

Read article →
Glossary7 min read

Development high risk area: coal mining legacy explained

Sites in a development high risk area need a coal mining risk assessment with the planning application. Here is what the designation records and what it changes on site.

Read article →
Project Type Guides8 min read

How to get planning permission for a rural workers dwelling

National policy allows an isolated rural home where there is an essential need for a worker to live at or near their place of work. Councils refuse these applications on functional need and finances long before anyone looks at the drawings.

Read article →
Which Reports Do I Need8 min read

Documents for a new nursery in a residential street

Converting a dwellinghouse to a day nursery is a material change of use, and it turns on outdoor play noise and drop-off arrangements. Play noise falls outside BS 4142, which catches out consultants and applicants alike.

Read article →
Glossary7 min read

Twin tracking: running two applications at once

Once an appeal is lodged on non-determination the council loses jurisdiction, so an applicant with one application must choose between appealing and negotiating. Twin tracking removes that choice, at a price.

Read article →
Templates, Checklists and Examples7 min read

A schedule of drawings that officers can follow

The drawing schedule tells the validation officer what was submitted, tells the case officer which version they are assessing, and ends up as the legal content of the approved plans condition.

Read article →
Comparisons8 min read

Tree preservation order against conservation area notice

Under a Tree Preservation Order the council has to say yes. For a tree in a conservation area, six weeks of silence is enough. The two regimes look similar and work very differently.

Read article →
Project Type Guides8 min read

How to get planning permission for a climbing centre

Indoor climbing falls in Class E(d), so putting a centre into a warehouse is a material change of use. Employment land policy and evening parking evidence decide most of these applications.

Read article →
Which Reports Do I Need7 min read

Which reports an upward extension to a block of flats needs

Part 20 of the GPDO 2015 allows additional storeys on a block of flats through prior approval, but the matters the council may consider are wide enough that the evidence bundle looks like a full application.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope