Templates, Checklists and Examples7 min read

Drafting model wording for a plant noise condition

Most plant noise conditions are unenforceable. They set a limit at the boundary, or ask for inaudibility, and nobody can say whether they have been complied with.

Read article →
Comparisons6 min read

Grampian conditions or negative obligations: which secures it

A negatively worded condition costs less and moves faster than an agreement. It also fails where the works depend on land nobody has control of, and that is the whole argument.

Read article →
Project Type Guides6 min read

How to get planning permission for glamping pods on a farm

The first question on a glamping scheme is not design. It is whether your pods meet the statutory caravan definition, because that changes the consent route entirely.

Read article →
Which Reports Do I Need6 min read

Documents for an annexe for a dependent relative

Councils are not assessing whether your annexe is nice. They are assessing whether it is a separate dwelling in disguise, and the drawings decide it.

Read article →
Glossary6 min read

Habitat banks and buying off-site biodiversity units

Off-site units are a legal product, not a commodity. What you are buying is an entry on a register backed by a 30 year agreement, and the paperwork is the asset.

Read article →
Planning Law Updates6 min read

Higher-risk buildings: what the threshold changes at planning

Crossing the higher-risk threshold changes the consent programme, the core layout and the cost of a late design change. Test the measurement before the massing is fixed.

Read article →
Professionals and Qualifications6 min read

Agricultural Land Classification and who can survey it

The line between grade 3a and grade 3b is the line between best and most versatile land and ordinary farmland. A published provisional map is not good enough to settle it.

Read article →
Wales, Scotland and Northern Ireland6 min read

Pre-application community consultation in Northern Ireland

Northern Ireland made community consultation a statutory step before major applications. Get the notice period wrong and the council can refuse to accept the application.

Read article →
Templates, Checklists and Examples6 min read

A photographic viewpoint schedule that stands up to scrutiny

Photographs win landscape and heritage arguments, or lose them. The difference is usually whether the viewpoints were agreed before the camera came out.

Read article →
Comparisons6 min read

Section 278 or section 38: which highway agreement applies

One agreement alters a road that already exists, the other hands a new one to the highway authority. Most schemes of any size need both, and the bonds are what surprise people.

Read article →
Which Reports Do I Need6 min read

Documents for a loft conversion with a rear dormer

Most rear dormers are permitted development. The ones that are not usually fail on volume, on a conservation area designation, or on a side window nobody obscured.

Read article →
Glossary6 min read

Strategic significance in the statutory biodiversity metric

Strategic significance rewards habitat in the right place. Claiming the high category without a strategy or plan designation behind it is the error reviewers see most.

Read article →
Planning Law Updates6 min read

Fire statements at Planning Gateway One: scope and content

A fire statement is a validation requirement for relevant buildings, not a technical afterthought. Submitting the wrong document stops the application before it starts.

Read article →
Professionals and Qualifications6 min read

Lighting competence and ILP GN01 in planning applications

Lighting objections are usually won or lost on two things: the environmental zone the site sits in, and whether the isolux plot actually shows the boundary.

Read article →
Wales, Scotland and Northern Ireland6 min read

Section 76 planning agreements in Northern Ireland

Northern Ireland has no Community Infrastructure Levy. Every contribution a council seeks has to be secured through a section 76 agreement, which changes how you negotiate.

Read article →
Templates, Checklists and Examples6 min read

A pre-application enquiry: what to put in it and what to ask

A pre-application enquiry is worth what you put into it. Vague questions produce vague advice, and vague advice is useless six months later when the case officer has changed.

Read article →
Professionals and Qualifications6 min read

IAQM competence for air quality and construction dust

Air quality assessments are judged on method and on the person who applied it. Knowing what the guidance expects of an assessor tells you whether the report you have paid for will survive consultation.

Read article →
Comparisons6 min read

Foul sewage or water supply assessment: which one you need

Two short documents, two different undertakers, two different failure modes. On a single plot the foul sewage answer usually decides whether the scheme works at all.

Read article →
Which Reports Do I Need6 min read

Which reports a single wind turbine planning application needs

A single turbine attracts a tighter but stranger evidence base than most rural schemes. Shadow flicker, radar safeguarding and ETSU noise are the three nobody expects.

Read article →
Glossary6 min read

Windfall sites: how councils count unplanned homes in supply

Windfall allowances quietly do a lot of work in housing land supply arguments. The Framework sets a demanding evidence test, and an inflated allowance is worth challenging.

Read article →
Planning Law Updates6 min read

Part O overheating and what it does to planning drawings

Part O is a Building Regulations requirement, but it reshapes elevations, balconies and window sizes. Designing the planning drawings without it invites a redesign after permission.

Read article →
Wales, Scotland and Northern Ireland6 min read

Building in the Northern Ireland countryside: the CTY tests

Northern Ireland assesses countryside housing against the CTY policies of Planning Policy Statement 21. The tests are specific, numerical in places, and quite unlike English countryside policy.

Read article →
Templates, Checklists and Examples6 min read

A discharge of conditions pack: what to submit and when

A decision notice is a work schedule in disguise. Sorting the conditions by trigger point before you order materials is what keeps a self-build on programme.

Read article →
Comparisons6 min read

Noise assessment or extraction statement: which a fit out needs

Fitting out a restaurant or takeaway usually attracts two separate documents: a noise assessment for the plant and an extraction statement for the odour. They overlap on the fan and nowhere else.

Read article →