9058 articlesDrafting model wording for a plant noise condition
Most plant noise conditions are unenforceable. They set a limit at the boundary, or ask for inaudibility, and nobody can say whether they have been complied with.
Grampian conditions or negative obligations: which secures it
A negatively worded condition costs less and moves faster than an agreement. It also fails where the works depend on land nobody has control of, and that is the whole argument.
How to get planning permission for glamping pods on a farm
The first question on a glamping scheme is not design. It is whether your pods meet the statutory caravan definition, because that changes the consent route entirely.
Documents for an annexe for a dependent relative
Councils are not assessing whether your annexe is nice. They are assessing whether it is a separate dwelling in disguise, and the drawings decide it.
Habitat banks and buying off-site biodiversity units
Off-site units are a legal product, not a commodity. What you are buying is an entry on a register backed by a 30 year agreement, and the paperwork is the asset.
Higher-risk buildings: what the threshold changes at planning
Crossing the higher-risk threshold changes the consent programme, the core layout and the cost of a late design change. Test the measurement before the massing is fixed.
Agricultural Land Classification and who can survey it
The line between grade 3a and grade 3b is the line between best and most versatile land and ordinary farmland. A published provisional map is not good enough to settle it.
Pre-application community consultation in Northern Ireland
Northern Ireland made community consultation a statutory step before major applications. Get the notice period wrong and the council can refuse to accept the application.
A photographic viewpoint schedule that stands up to scrutiny
Photographs win landscape and heritage arguments, or lose them. The difference is usually whether the viewpoints were agreed before the camera came out.
Section 278 or section 38: which highway agreement applies
One agreement alters a road that already exists, the other hands a new one to the highway authority. Most schemes of any size need both, and the bonds are what surprise people.
Documents for a loft conversion with a rear dormer
Most rear dormers are permitted development. The ones that are not usually fail on volume, on a conservation area designation, or on a side window nobody obscured.
Strategic significance in the statutory biodiversity metric
Strategic significance rewards habitat in the right place. Claiming the high category without a strategy or plan designation behind it is the error reviewers see most.
Fire statements at Planning Gateway One: scope and content
A fire statement is a validation requirement for relevant buildings, not a technical afterthought. Submitting the wrong document stops the application before it starts.
Lighting competence and ILP GN01 in planning applications
Lighting objections are usually won or lost on two things: the environmental zone the site sits in, and whether the isolux plot actually shows the boundary.
Section 76 planning agreements in Northern Ireland
Northern Ireland has no Community Infrastructure Levy. Every contribution a council seeks has to be secured through a section 76 agreement, which changes how you negotiate.
A pre-application enquiry: what to put in it and what to ask
A pre-application enquiry is worth what you put into it. Vague questions produce vague advice, and vague advice is useless six months later when the case officer has changed.
IAQM competence for air quality and construction dust
Air quality assessments are judged on method and on the person who applied it. Knowing what the guidance expects of an assessor tells you whether the report you have paid for will survive consultation.
Foul sewage or water supply assessment: which one you need
Two short documents, two different undertakers, two different failure modes. On a single plot the foul sewage answer usually decides whether the scheme works at all.
Which reports a single wind turbine planning application needs
A single turbine attracts a tighter but stranger evidence base than most rural schemes. Shadow flicker, radar safeguarding and ETSU noise are the three nobody expects.
Windfall sites: how councils count unplanned homes in supply
Windfall allowances quietly do a lot of work in housing land supply arguments. The Framework sets a demanding evidence test, and an inflated allowance is worth challenging.
Part O overheating and what it does to planning drawings
Part O is a Building Regulations requirement, but it reshapes elevations, balconies and window sizes. Designing the planning drawings without it invites a redesign after permission.
Building in the Northern Ireland countryside: the CTY tests
Northern Ireland assesses countryside housing against the CTY policies of Planning Policy Statement 21. The tests are specific, numerical in places, and quite unlike English countryside policy.
A discharge of conditions pack: what to submit and when
A decision notice is a work schedule in disguise. Sorting the conditions by trigger point before you order materials is what keeps a self-build on programme.
Noise assessment or extraction statement: which a fit out needs
Fitting out a restaurant or takeaway usually attracts two separate documents: a noise assessment for the plant and an extraction statement for the odour. They overlap on the fan and nowhere else.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope