Articles – page 33

9588 articles
Seasonal Calendar7 min read

Parking surveys, school holidays and the survey calendar

The overnight parking methodology works because it counts cars when people are at home. School holidays, vacations and August break that assumption and cost a repeat survey.

Read article →
AI and Planning7 min read

Flagged gaps in a draft and how to close them properly

An AI draft that stops and flags a missing site fact is safer than one that estimates it. How to close each kind of flag from the source a council would check.

Read article →
Fire, Structural and Basements7 min read

Dry riser inlets and where they land on an elevation

Fire main inlets are a building regulations requirement that lands on a planning elevation. Where BS 9990 allows the box to go, and how to draw it before permission rather than after.

Read article →
Energy, Sustainability and Carbon7 min read

Fabric energy efficiency and condition wording that works

A condition listing U-values breaks the moment an insulation product changes. One naming a fabric performance figure and its methodology survives the build and is easier to discharge.

Read article →
Noise, Air, Odour and Light7 min read

Lighting assessments for floodlit outdoor sport

Floodlighting refusals turn on spill, glare and curfews rather than on pitch illuminance. The outputs a council expects, and the modelling assumptions that get challenged.

Read article →
Transport, Highways and Parking7 min read

Kerbside management for a town centre scheme

A planning permission cannot deliver a kerbside change. The order is a separate statutory process with its own timetable and its own ways of failing, and the risk needs pricing early.

Read article →
Heritage and Archaeology8 min read

War memorials: repair, relocation and consent

Repair and added names are routinely consented. Relocation is treated as harm to a deliberately chosen setting. How the consent routes differ, including the faculty system in churchyards.

Read article →
Viability, Obligations and Commercial7 min read

Developer return assumptions by tenure in an appraisal

National guidance works from 15 to 20 per cent of gross development value and accepts a lower return on affordable housing. How to split, evidence and sensitivity test the figure.

Read article →
Commercial Occupiers7 min read

Merging two shop units into one and the frontage test

Combining two retail units rarely needs permission for the works. The test that matters is the adopted plan's policy on losing units and on maximum shopfront width.

Read article →
Wales, Scotland and Northern Ireland7 min read

Development classification in Northern Ireland explained

Northern Ireland sorts applications into three statutory classes, and the class decides the decision maker, the pre-application duties and the appeal route. How to establish yours before you submit.

Read article →
Residential Scale Thresholds7 min read

Counting units where the scheme is an HMO or cluster flats

Bedspaces, planning units and dwelling equivalents are three different numbers, and the one you put on the form decides which thresholds bite. How to work out the count and defend it.

Read article →
Householder Extensions and Conversions7 min read

Replacing a boundary wall in a conservation area

Demolition and replacement of a boundary wall in a conservation area are two separate consents with two different height tests. Here is how the thresholds work and what to record before the wall comes down.

Read article →
Transport, Highways and Parking6 min read

Motorcycle and powered two-wheeler parking requirements

Powered two-wheeler provision comes from the authority's own parking standards rather than national policy, which is why it is so often missed until the highway consultation.

Read article →
Fire, Structural and Basements7 min read

Residential sprinklers to BS 9251 and the planning angle

Sprinklers are a Building Regulations requirement with a planning consequence: a stored supply needs a tank and pump room, and that room has to be on the submitted drawings.

Read article →
Energy, Sustainability and Carbon7 min read

Connecting to a district heat network: the requirement

Heat network requirements come from local plan policy rather than national rules. Distance to the nearest network, and its programme, decide most of these cases.

Read article →
Noise, Air, Odour and Light7 min read

Odour and separation distances from agricultural buildings

Distances quoted in objections range from 100 to 400 metres and none of them is statutory. The source, the receptor, the wind and the management regime decide the case.

Read article →
Heritage and Archaeology7 min read

Ice houses, dovecotes and small ancillary structures

Clearing ivy off a dovecote can need listed building consent and a bat licence. Establish the designation, record before touching anything, and stabilise rather than restore.

Read article →
Viability, Obligations and Commercial7 min read

Employment and skills plans secured by planning obligation

An employment and skills plan is a delivery contract, not a statement of intent. The definitions of construction value and local area decide whether the targets are achievable.

Read article →
Commercial Occupiers7 min read

Subdividing one retail unit into two: what needs permission

Internal works that do not affect external appearance are not development, and movement within a use class is not a material change of use. The application usually comes from the shopfront or a condition.

Read article →
Wales, Scotland and Northern Ireland6 min read

Which policy applies in Northern Ireland before an LDP

Northern Ireland policy is district-specific and changes on a date. Retained planning policy statements cease to apply in a council area once its Plan Strategy is adopted.

Read article →
Residential Scale Thresholds7 min read

Water and sewerage capacity as the unit count rises

The point at which a connection becomes a reinforcement programme varies by catchment, not by policy. Submit the pre-development enquiry before the layout is drawn.

Read article →
Householder Extensions and Conversions7 min read

Extending a flat at ground floor into a garden

A ground floor flat extension needs a full planning application rather than a householder one, and the amenity of the flats above matters as much as the neighbours'.

Read article →
Council Guides7 min read

Housing mix policies and dwelling size requirements

Mix and space standards come from the local plan, not from national rules, and the nationally described space standard only applies where an authority has adopted it with evidence.

Read article →
Seasonal Calendar6 min read

Botanical condition surveys and the growing season

Habitat condition scoring needs plants in growth, so the April to September window sets the submission date rather than the other way round. Work the programme backwards from it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope