Articles – page 44

9567 articles
Constraints and Designations6 min read

Site allocations and what being allocated really means

An allocation gives substantial policy support and a list of obligations. What it settles, what it leaves open and how to read the policy text against the policies map.

Read article →
Permitted Development6 min read

Hedges, trees and permitted development on a boundary

You can plant a hedge to any height without permission. Fences are capped at one or two metres, evergreen hedges over two metres fall under the high hedges regime, and protected trees need consent.

Read article →
Project Type Guides6 min read

Getting permission for a paintball or airsoft site in woodland

Woodland paintball and airsoft applications turn on impulsive noise, a single track access and what tracks and parking do to tree roots. What to submit and what to offer.

Read article →
Which Reports Do I Need6 min read

Which documents a Class AA upward extension needs

Prior approval for additional storeys is judged on a closed list: daylight in the new homes, amenity, appearance, structure and construction management. What to submit for each.

Read article →
AI and Planning6 min read

Checking a planning document for contradictions after edits

Case officers lose confidence in a bundle whose numbers disagree. A mechanical way to reconcile site area, units, floorspace and the description of development before you submit.

Read article →
Constraints and Designations6 min read

Water neutrality in Sussex North and the evidence needed

Development in the Sussex North water supply zone must add no net water demand. How the figure is calculated, what offsetting an authority will accept and how it gets secured.

Read article →
Permitted Development6 min read

Rebuilding a house after a fire: repair or rebuild

A full rebuild after fire damage is a building operation and so needs permission. Repair to the same external appearance may not. How councils draw the line and how to evidence it.

Read article →
Project Type Guides6 min read

Planning permission for a beach hut or coastal structure

A beach hut application is decided by coastal change policy, whether the structure sits below mean high water, and whether anyone will sleep in it. What to expect and what to submit.

Read article →
Which Reports Do I Need6 min read

Which reports a floodlit all-weather pitch needs

A floodlit artificial pitch brings four issues at once: playing field policy, obtrusive light, surface water from an impermeable surface and concentrated evening traffic.

Read article →
AI and Planning6 min read

Describing AI assistance in a fee proposal to a client

Clients are not troubled by AI-assisted drafting. They are troubled by not knowing who is responsible. Wording for the scope, exclusions and fee basis in a planning fee proposal.

Read article →
Constraints and Designations6 min read

Ministry of Defence safeguarding and consultation zones

Military aerodrome, technical site and explosives safeguarding zones each ask a different question of a proposal. How to find out whether a site is affected and how objections get resolved.

Read article →
Permitted Development6 min read

Prior approval: what the 56 day rule really means

If the council does not decide a Class MA or Class Q prior approval within 56 days, you may build. The period, the start date and the records you need to keep.

Read article →
Project Type Guides7 min read

Planning permission for a community shop in a village house

Putting a community shop in the front room of a village house is a mixed use application, not a full change of use. The policy support, the parking argument and the conditions that make it work.

Read article →
Which Reports Do I Need7 min read

Which reports a children's home in a house needs

Most registered children's homes in an ordinary house are Class C2 rather than C3, which makes the change a material change of use. This is the document bundle that follows.

Read article →
Permitted Development6 min read

Permitted development and the 18 metre height threshold

The Part 20 height caps and the building safety height condition use the same number for different purposes. Where schemes get caught between them.

Read article →
Project Type Guides6 min read

Planning permission for a container yard or storage units

Decide first whether the containers are buildings or a change of use of land. Then deal with stacking height, drainage and separation between stacks.

Read article →
AI and Planning7 min read

What a drafted Construction Management Plan cannot know

A draft gives you the structure and the controls. The plant list, programme and swept paths come from the contractor, which decides when you can submit.

Read article →
Permitted Development7 min read

Householder rights at a house in multiple occupation

The Order defines dwellinghouse by excluding flats, not shared houses. Where Part 1 rights are available at an HMO, and where a certificate is the only safe route.

Read article →
Project Type Guides7 min read

Planning permission for a hot food takeaway near a school

Read the exclusion zone policy wording first: the distance and the measurement point decide viability. Then the extraction specification decides the rest.

Read article →
AI and Planning7 min read

Drafted condition wording and why authorities rewrite it

Offer a condition schedule tied to drawing numbers and reasons. Which phrases get rewritten, and why the statutory agreement rule matters to consultants.

Read article →
Permitted Development6 min read

Permitted development rights after an enforcement notice

Compliance does not discharge an enforcement notice, and it does not restore permitted development rights. Why the route back is an application, not a right.

Read article →
Project Type Guides7 min read

Planning permission for a boutique hotel in a listed townhouse

Two consents, one constraint. How to route bathrooms and services through a townhouse without harming its hierarchy of rooms, and what the fire strategy forces.

Read article →
Which Reports Do I Need6 min read

Reports for a temporary use under the 28 day right

Twenty-eight days in total per calendar year, 14 for markets and motor sports, and nothing within the curtilage of a building. What to do when you run out.

Read article →
AI and Planning7 min read

Using a draft to write an objection or consultation response

Pick two or three material considerations, tie each to a numbered policy, and add a measurement or a photograph. The rest is structure a draft can give you.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope