Articles – page 59

9539 articles
Constraints and Designations7 min read

Plantation on an ancient woodland site and its protection

A plantation on an ancient woodland site is still ancient woodland, because the designation attaches to soil continuity rather than to the trees standing on it.

Read article →
Householder Extensions and Conversions7 min read

Designing a basement under a terraced house

Depth, extent beneath the garden, soil cover and light well design decide most householder basement applications. The structural and hydrogeological evidence does the rest.

Read article →
Noise, Air, Odour and Light7 min read

Separation distances for intensive livestock odour

Separation distance is a screening tool for intensive livestock odour, not a standard. Clearing it decides how much evidence you need, and ammonia screening against designated habitats often decides the application.

Read article →
Trees and Arboriculture7 min read

Tree planting conditions: species, size and maintenance

Tree planting conditions ask for a plan, a species schedule, a specification and a maintenance period. A complete discharge package is usually determined without correspondence.

Read article →
Transport, Highways and Parking7 min read

Car club spaces as transport mitigation

A car club space is inexpensive mitigation and easy to deliver badly. Operator viability, traffic order risk and location accessibility decide whether it works.

Read article →
Flood, Drainage and SuDS7 min read

Infiltration drainage where the ground is contaminated

Clean water entering contaminated soil becomes a flushing mechanism towards groundwater. That is why the drainage hierarchy and groundwater protection pull in opposite directions on brownfield sites.

Read article →
Constraints and Designations7 min read

A designations checklist before exchanging contracts

Standard searches cover local land charges, not environmental designations. The constraints that stop a self-build plot being developable usually have to be looked up directly.

Read article →
Householder Extensions and Conversions7 min read

Loft conversion stairs and the planning drawings

The staircase decides how much of a loft is usable and where the dormer has to go. The section through the stair is the drawing that settles whether a conversion works.

Read article →
Noise, Air, Odour and Light7 min read

Odour units and dynamic olfactometry explained

An odour unit is a dilution factor, not a mass. Dynamic olfactometry produces the number, and reviewing what sits behind it separates a defensible odour assessment from an impressive-looking one.

Read article →
Trees and Arboriculture7 min read

Pruning specifications councils will condition

Reduce by 30 per cent means nothing to a tree officer. BS 3998 specifies pruning by the dimensions of the crown that remains, and a specification written that way can be approved in one pass.

Read article →
Transport, Highways and Parking7 min read

Framework travel plans for phased schemes

A framework travel plan sets the objectives, measures and monitoring for a phased scheme and commits to a full plan per phase. Its value depends entirely on the triggers attached to it.

Read article →
Flood, Drainage and SuDS7 min read

Separating foul and surface water on a conversion

Councils and sewerage undertakers expect foul and surface water to be separated on a conversion. On an older building served by a combined drain, partial separation with a stated reason is usually the honest answer.

Read article →
Constraints and Designations7 min read

Safeguarding directions for major infrastructure schemes

A safeguarding direction tells councils to consult the scheme promoter and to refuse development that would prejudice a major project. It will not show up in the local plan or a standard search.

Read article →
Householder Extensions and Conversions7 min read

Flat roof against pitched roof on a rear extension

The 4 m overall and 3 m eaves limits in Class A decide most rear extension roof forms. Once you are applying for permission, the design guide takes over and often prefers a pitch.

Read article →
Noise, Air, Odour and Light7 min read

Carbon filtration for commercial kitchen odour control

Activated carbon only controls kitchen odour if the grease filtration upstream of it works. The cooking process, not the equipment list, sets the specification an environmental health officer will accept.

Read article →
Trees and Arboriculture7 min read

Soil volumes and pit design for new street trees

Soil volume decides whether a street tree reaches the size on the drawing or dies at fifteen years. Sizing it from mature canopy area, and specifying the pit, matters more than species choice.

Read article →
Transport, Highways and Parking7 min read

Travel plan bonds and penalty payments in an obligation

A travel plan bond holds money the council can draw on if modal share targets are missed. A penalty payment becomes due on failure. Both have to satisfy regulation 122, and the drafting matters more than the figure.

Read article →
Flood, Drainage and SuDS7 min read

Attenuation beneath a car park: loading and access

Below ground attenuation under a car park has to carry vehicle loads and stay maintainable for decades. Most failures on these schemes are maintenance problems created at design stage.

Read article →
Constraints and Designations7 min read

Marine licensing where a site reaches the tideline

A site that reaches the foreshore sits in two consent regimes at once. Planning permission runs to the low water mark, while marine licensing starts at mean high water springs.

Read article →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Residential Scale Thresholds6 min read

When a scheme needs environmental impact screening

More than 150 dwellings or more than five hectares puts a scheme into Schedule 2 of the EIA Regulations 2017. Crossing a threshold does not mean an environmental statement is needed, but it does make screening unavoidable.

Read article →
Householder Extensions and Conversions7 min read

Setting back a two storey side extension

A two storey side extension always needs planning permission, and setting the front wall back from the original frontage is usually the change that turns a refusal into an approval.

Read article →
Project Type Guides7 min read

Planning permission for a zip wire course in woodland

A woodland zip wire course needs full planning permission, and the case turns on ancient woodland status, what the anchors and platforms do to the trees, and whether the access can take visitor traffic.

Read article →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope