Articles – page 66

9527 articles
Costs, Fees and Budgeting6 min read

Costing an overheating risk assessment under TM59

The modelling is a day or two of work. Settling the inputs and re-running after each facade change is where a TM59 fee actually goes.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting ground investigation across two phases

Drilling is rarely the biggest item. Gas monitoring visits spread over months and the laboratory schedule set both the cost and the programme of a phase 2 investigation.

Read article →
Costs, Fees and Budgeting6 min read

Costing a BREEAM pre-assessment and the certification route

Only the pre-assessment is needed at planning stage. Registration, design stage and post-construction certification are charged separately, and construction evidence gathering is the cost most projects miss.

Read article →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →
Project Type Guides7 min read

Permission for a basement cinema under a listed house

A basement under a listed building needs listed building consent, a structural method statement and usually a basement impact assessment. The statutory duty on harm decides most of these cases.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Glossary6 min read

Receptor: who and what an assessment protects

Receptor is the third term in the source-pathway-receptor chain, and every discipline defines it slightly differently. Getting the list right is what makes the rest of an assessment defensible.

Read article →
Glossary7 min read

Reasonable worst case: what it means in assessment

An outline or parameter-based scheme still has to be assessed against something definite. Reasonable worst case is how that is done, and the parameters you fix decide whether the assessment holds.

Read article →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →
Permitted Development8 min read

Article 4 directions: checking, scope and compensation

An Article 4 direction removes a permitted development right in a mapped area. Read the direction itself, check which classes it names, and claim the fee exemption on any application it causes.

Read article →
Professionals and Qualifications7 min read

Energy assessor competence for an energy statement

An accredited energy assessor produces the modelling for an energy statement. Reading the local policy and staging the hierarchy is a separate skill, and the gap between the two is where statements fail.

Read article →
Costs, Fees and Budgeting7 min read

What verified views cost on a tall building scheme

Rendering a photomontage is quick. Surveying the camera position, registering the model to surveyed targets and documenting the chain is what makes a view verified, and what sets the fee.

Read article →
Project Type Guides7 min read

Tennis court permission in a National Landscape

The playing surface can be made to disappear. A three metre enclosure in open countryside cannot, which is why fence colour, height and extent decide most tennis court applications in a National Landscape.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →
Glossary8 min read

Enabling development: the heritage exception explained

Enabling development permits development contrary to policy because it funds the repair and future of a heritage asset. The tests are demanding, and the deficit has to come from the building rather than the owner.

Read article →
Use Classes and Change of Use7 min read

Veterinary practices: Class E or sui generis?

Consulting surgeries are usually treated as Class E. Boarding, catteries and dog day care sit outside the Use Classes Order entirely, so a practice doing both runs a mixed use with no fallback.

Read article →
Permitted Development7 min read

Paragraph W and how prior approval procedure works

Paragraph W is the procedure behind every Part 3 change of use needing prior approval. It sets the information required, the consultation duties, the 56 day deemed approval and the limits on conditions.

Read article →
Professionals and Qualifications7 min read

Who carries out a TM59 overheating assessment

TM59 overheating assessments are not reserved to any registered profession. What separates a usable report from a decorative one is the weather file, the openable area assumed and which units were tested.

Read article →
Costs, Fees and Budgeting7 min read

What a wind microclimate assessment really costs

The cost of wind microclimate work is set by how many configurations go through the tunnel. Scoping the measurement points, the mitigation variant and the cumulative schemes decides the fee before anyone is appointed.

Read article →
Project Type Guides7 min read

Planning permission for a farm micro distillery

A working still is a general industrial use, which rules out the agricultural conversion shortcuts. Odour abatement, trade effluent and HMRC approval of the spirit store shape the application more than policy does.

Read article →
Which Reports Do I Need7 min read

Consents for a scaffold gantry over the public highway

Hoardings and scaffolds sit inside Part 4 permitted development, but the licences that control them come from the highway authority under the Highways Act 1980, and hoarding graphics are a separate advertisement consent.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope