Articles – page 72

9517 articles
Glossary7 min read

Characteristic situation: classifying ground gas risk

Ground gas behaviour is driven by pressure, so a single dry day reading proves very little. The classification combines the worst concentration with the worst flow rate.

Read article →
Fire, Structural and Basements7 min read

Building beside railway infrastructure: asset protection

The council decides the application. The infrastructure manager decides whether your piling rig, your crane and your drainage are acceptable next to a live railway.

Read article →
Scenario Walkthroughs7 min read

An air conditioning unit and a neighbour complaint

A unit can be lawful in planning terms and still be abated as a statutory nuisance, and it can need permission while making almost no noise at all.

Read article →
Costs, Fees and Budgeting7 min read

Archaeological post-excavation and archive costs

An excavation produces a hole, a set of records and a quantity of material. The records and the material are liabilities until they have been analysed, published and deposited.

Read article →
Neighbours, Objections and Community7 min read

Asking the council to make an Article 4 direction

Councils move slowly on Article 4 because of compensation liability. A request that acknowledges it, and asks for a twelve month deferred start, gets a better hearing.

Read article →
Professionals and Qualifications7 min read

Writing a consultant brief you can hold someone to

Asked to assess noise, a careful acoustician prices a full survey and an aggressive one prices a desk review. Both are honest answers to the same words, and neither is comparable.

Read article →
Fire, Structural and Basements7 min read

Transfer structures over a commercial ground floor

The transfer zone sits between the commercial ceiling and the first residential floor, and it is additive. Developers usually discover that after the massing is fixed.

Read article →
Scenario Walkthroughs7 min read

A holiday let refused on a C3 dwelling: a walkthrough

Nothing physical changed. No extension, no new door, no sign. The entire case turned on the pattern of occupation and the listing's own dated review history.

Read article →
Costs, Fees and Budgeting7 min read

How a Grampian condition affects finance drawdown

The cost is almost never the off-site works themselves. It is the carry between holding a permission and holding one you can lawfully implement.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a change of use that needs no permission

Moving between two uses in the same class is not development, so no application exists. The remedies people reach for apply to permitted development rights, which is a different thing.

Read article →
Professionals and Qualifications6 min read

Peer review of a technical report: scope and value

A reviewer can tell you whether the method followed the standard. A reviewer cannot tell you whether the sound meter was calibrated or whether the survey happened at all.

Read article →
Fire, Structural and Basements7 min read

Modular construction: what the planning submission must fix

A modular system stacks a ceiling cassette on a floor cassette at every junction. Over six storeys that extra floor zone can take a scheme over a height limit expressed in metres.

Read article →
Scenario Walkthroughs7 min read

A scheme that failed on biodiversity net gain

A net gain failure rarely happens at application stage. It happens when the biodiversity gain plan goes in for approval, the authority says no, and the site cannot lawfully start.

Read article →
Comparisons6 min read

Ownership certificate A or B on a planning application

Owner means the freeholder and any lessee with at least seven years left to run. A monthly tenant is not an owner. A tenant with twelve years remaining is.

Read article →
Costs, Fees and Budgeting7 min read

Licences to occupy the highway during construction

Highway occupation charges accrue whether or not work is happening, and they sit outside the planning fee and the building control charge. On an urban site they run for the whole programme.

Read article →
Neighbours, Objections and Community7 min read

Petitions and template objections: how officers treat them

Public opposition is not itself a material consideration. The matters the opposition is about, if they are planning matters, are. That distinction decides whether a campaign changes anything.

Read article →
Professionals and Qualifications7 min read

Whole life carbon assessment: who is competent to do it

There is no register and no protected title for whole life carbon assessment. What exists is a professional standard, a London reporting template that exposes weak work, and a handful of judgement calls that go wrong predictably.

Read article →
Fire, Structural and Basements7 min read

Flood resilient construction and its structural effects

Standing water is heavy, it pushes sideways and it lifts. A wall detailed to exclude a metre of water carries loads an ordinary cavity wall was never designed for.

Read article →
Costs, Fees and Budgeting7 min read

Commuted sums for open space maintenance explained

Councils price open space maintenance as area by annual rate by commutation period, then ask for it as a lump sum in the section 106 agreement. Here is how the figure is built and how the drafting changes what you pay.

Read article →
Commercial Occupiers7 min read

Temporary use of a vacant unit for a pop up

The 28 day right in Part 4 Class B applies to land, not to buildings or land within a building's curtilage. That single limitation defeats most high street pop ups.

Read article →
Scenario Walkthroughs7 min read

A veterinary practice with overnight care: a walkthrough

The building use was already acceptable. The 24 hour operation, with barking at 3am and a condenser running against a party boundary, is what the application had to justify.

Read article →
Comparisons7 min read

Foul Sewage Assessment or Utilities Assessment

Foul drainage is a question on the application form, so a weak answer delays validation. Utilities capacity bites later, when the network operator quotes for a reinforcement nobody budgeted for.

Read article →
Comparisons8 min read

Land contamination Phase 1 or Phase 2 investigation

The difference is not depth of detail. It is whether anyone put a hole in the ground, and the two reports answer different questions at different points.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a public exhibition for a major scheme

An exhibition that produces a photograph of a full room and no analysis has spent money without buying anything. The budget should follow what the statement has to prove.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope