Articles – page 78

9506 articles
Daylight, Sunlight and Amenity7 min read

Light wells and daylight to lower ground floor flats

A lower ground room sees only a slice of sky, so daylight has to be engineered rather than assumed. These are the geometric moves that work, and the ones councils refuse.

Read article →
Use Classes and Change of Use7 min read

Conditions that tie a permission to one Class E sub-use

Class E lets a use move freely between shops, offices, gyms and clinics. A single condition on an old permission can take all of that away, and most buyers never read it.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a dropped kerb refused on highway grounds

This illustrative walkthrough follows a front garden parking proposal from a highway refusal through to a revised scheme, and separates the planning permission from the highway authority's own crossing consent.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →
Comparisons7 min read

Dropped kerb application or planning permission: which one

A dropped kerb and the planning permission for a driveway are two different consents from two different parts of the council. This explains which one you need, in what order, and what each costs you in time.

Read article →
Which Reports Do I Need7 min read

Which reports a dental or medical surgery change of use needs

A dental or medical surgery sits within Class E(e), which means the change of use is often not development at all. The documents that matter are the ones about parking turnover, plant noise and waste storage.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a scheme that has been amended twice

When drawings change twice during determination, the question stops being whether the original scheme was acceptable and becomes whether you were given a fair chance to comment on what is now proposed.

Read article →
Planning Law Updates7 min read

The Fire Safety (England) Regulations and planning design

Secure information boxes, wayfinding signage and firefighting lift checks are operational duties, but they presuppose space, access and visibility that have to exist in the design. Here is what planning drawings should anticipate.

Read article →
Fire, Structural and Basements7 min read

Firefighting shafts, dry risers and the planning layout

A firefighting shaft is set early and is expensive to move later. This covers what the shaft contains, where the inlet has to sit relative to appliance access, and what the planning drawings should show at application stage.

Read article →
Daylight, Sunlight and Amenity7 min read

Setting a daylight baseline where a neighbour holds consent

Where the neighbouring site holds a permission nobody has built, the existing condition may flatter your scheme or punish it. This sets out when a consented baseline is realistic and how to present both without inviting a double counting objection.

Read article →
Comparisons6 min read

Biodiversity gain plan or a BNG assessment: what differs

The metric assessment you commission to design a scheme and the biodiversity gain plan you submit to discharge the deemed condition are different documents with different deadlines. Mixing them up stops a site from starting lawfully.

Read article →
Use Classes and Change of Use7 min read

Proving a lawful existing use when the records are gone

A certificate of lawfulness puts the burden of proof on you, and the standard is the balance of probability. This sets out the documents that carry weight when the paperwork for the original use has vanished.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a dormer refused in an article 4 area

Where an article 4 direction has removed householder permitted development rights, a rear dormer needs full permission and is judged against the council's design guidance. This illustrative walkthrough follows one through refusal to approval.

Read article →
Planning Process6 min read

What happens in the first fortnight after you apply

The two weeks after you press submit decide when your eight week clock starts and who will write the report on your extension. Here is the sequence, and the small number of things worth doing while it runs.

Read article →
Which Reports Do I Need7 min read

Shop front replacement: which consents and reports you need

Replacing a shop front and its signage normally runs through two separate consent regimes at once. This explains which one catches what, where deemed consent runs out, and the documents a council will expect with each application.

Read article →
Comparisons7 min read

Relevant demolition or ordinary planning permission

Conservation area consent went in 2013 but the criminal offence stayed. Here is how relevant demolition differs from the Part 11 prior approval route.

Read article →
Householder Extensions and Conversions7 min read

Counting back to the original dwellinghouse

Previous owners' extensions eat into your allowance, and conservatories count. Here is how the original dwellinghouse baseline is fixed and proved.

Read article →
Which Reports Do I Need7 min read

Which reports a dark kitchen needs for planning

Dark kitchens are decided on odour and rider management. Here is the document pack, and why the use class is less settled than operators assume.

Read article →
Householder Extensions and Conversions7 min read

Householder applications where Article 4 applies

An Article 4 direction withdraws a permitted development right, it does not ban the work. Here is how to read the schedule and apply without a fee.

Read article →
Which Reports Do I Need7 min read

Report bundle for a bin and cycle store on flats

Blocks of flats have no householder permitted development rights, so a refuse or cycle store needs an application. Here is the evidence it turns on.

Read article →
Use Classes and Change of Use7 min read

Holiday lets and the use class position

A holiday let stays in Class C3 until the character of the use changes materially. Here is how that test is applied and what occupancy conditions mean.

Read article →
Planning Law Updates7 min read

The biodiversity gain site register and how entries work

The register is how off-site biodiversity units are verified rather than asserted. Here is what an entry contains and the four checks a reviewer should make.

Read article →
Seasonal Calendar7 min read

Archaeological evaluation and winter ground conditions

Saturated ground flattens the soil differences evaluation depends on. Here is what still works in winter, what does not, and how to programme around it.

Read article →
Fire, Structural and Basements7 min read

Evacuation lifts and what planning drawings must show

An evacuation lift needs a protected lobby, a refuge clear of the stair and a secondary power route. All of that is plan area, so decide it before the core is fixed.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope