Articles – page 79

9504 articles
Comparisons8 min read

Grampian condition or deed of variation: which route

Control of the land decides it. A Grampian condition bites on the permission; a deed of variation can only change an obligation the owner is already party to.

Read article →
Householder Extensions and Conversions7 min read

Decking and raised platforms in a garden

The 300 millimetre raised platform threshold decides whether garden decking needs permission. Here is how it is measured and what an application must show.

Read article →
Which Reports Do I Need7 min read

Documents for a heat pump on a block of flats

Class G covers blocks of flats as well as houses, but not a communal array. Here is where the right stops and what a planning submission needs instead.

Read article →
Planning Law Updates7 min read

Conservation covenants and how habitat is secured

A conservation covenant or a section 106 obligation are the only two ways to secure a biodiversity gain site. Here is how covenants work and when to use one.

Read article →
Seasonal Calendar7 min read

Air quality baseline monitoring and the twelve month year

Annual mean objectives need annual data. Here is how bias adjustment, annualisation and the council's published monitoring fit into a realistic programme.

Read article →
Fire, Structural and Basements7 min read

The fire statement form and what each section demands

A fire statement on the prescribed form is a validation requirement for relevant buildings. Here is what each section expects and the drawings it needs.

Read article →
Daylight, Sunlight and Amenity7 min read

Transient overshadowing plots and how officers use them

Transient shadow diagrams show extent at an instant, not duration. Here is how to produce them properly and keep them separate from the BRE sun on ground test.

Read article →
Use Classes and Change of Use7 min read

Student accommodation: which use class applies

Purpose built student accommodation has no use class of its own. Here is how C3, C4, C2 and sui generis divide up, and which conditions follow.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a dental surgery in a residential street

An illustrative walkthrough of converting a house to a dental practice, where the parking survey and the hours condition decided the outcome.

Read article →
London7 min read

Design review panels and the weight of their advice

A design review panel advises, it does not decide. What decides the outcome is whether the panel report was tied to policy and whether you answered it.

Read article →
Comparisons7 min read

Part 20 prior approval or a full application upwards

Part 20 prior approval is faster but the conditions are unforgiving. Here is how the age window, height caps and natural light test decide which route to use.

Read article →
Householder Extensions and Conversions7 min read

Replacing windows: when it is development at all

A like for like window swap is usually not development. Changing material, opening pattern or glazing bars can be, and flats and listed buildings follow different rules.

Read article →
Which Reports Do I Need7 min read

Which reports a micro-brewery in an industrial unit needs

Breweries get refused on odour and plant noise, and the taproom decides the use class. Here is the document pack a micro-brewery fit-out usually needs.

Read article →
Report Deep Dives8 min read

Lighting evidence for a padel court beside housing

Floodlit padel courts beside housing are decided on light intrusion at bedroom windows and the curfew offered. Here is the evidence that answers both.

Read article →
Residential Scale Thresholds7 min read

Levy liability at 100 square metres or one home

The Community Infrastructure Levy minor development exemption applies below 100 m2 of new floorspace, but never where the development creates a dwelling of any size.

Read article →
Comparisons7 min read

Permitted development or an Article 4 direction area

An Article 4 direction removes the automatic permission for named classes over named land. The schedule answers the question for your address, and no application fee is payable.

Read article →
Planning Law Updates7 min read

Commencement notices and completion notices explained

The Levelling-up and Regeneration Act 2023 requires a developer to notify the authority of the start date, adds progress reports for prescribed schemes, and reworks the completion notice power.

Read article →
Householder Extensions and Conversions7 min read

Dormer windows on a front roof slope

Class B of Part 1 excludes work extending beyond a roof slope that forms the principal elevation and fronts a highway. Both limbs must apply, so a few front slopes can still take a dormer.

Read article →
Which Reports Do I Need7 min read

Which reports a mezzanine in a warehouse needs

Inserting a mezzanine inside a warehouse is usually not development. Retail buildings above 200 m2, external changes, a change of use and floorspace conditions are the four exceptions.

Read article →
Seasonal Calendar7 min read

The annual five year housing land supply position

A published five year housing land supply is a snapshot at a base date, usually 1 April. Testing it means working site by site through the schedule rather than arguing about optimism in general.

Read article →
Fire, Structural and Basements7 min read

Reading a Gateway One consultation response from HSE

The Health and Safety Executive's Gateway One response is a statutory consultee response, not a decision. Most points are drawing omissions or inconsistencies that an addendum answers without any design change.

Read article →
Daylight, Sunlight and Amenity7 min read

Right to light against planning daylight: two tests

A right to light is an easement enforceable in the courts and measured by sky factor. Planning daylight is a material consideration assessed against BRE 209. Planning permission is no defence to an injunction.

Read article →
Use Classes and Change of Use7 min read

Sui generis to sui generis: no permitted change

Sui generis uses sit outside the Use Classes Order, so there is no class to move within and no general permitted change. Even a move between two sui generis uses needs a full application.

Read article →
Residential Scale Thresholds7 min read

The retail impact assessment threshold of 2,500 m2

The default national threshold for a retail impact assessment is 2,500 m2 of floorspace where a local plan sets no figure. The sequential test has no threshold at all and applies at any scale.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope