Articles – page 80

9502 articles
Which Reports Do I Need7 min read

Which reports a garden room or outbuilding needs

A garden room within the Class E limits and used incidentally needs no application and no reports. Trees, designated land and sleeping accommodation each change the answer in a different way.

Read article →
Planning Law Updates7 min read

Grey belt and the Green Belt policy change

Grey belt is a defined category of Green Belt land, not a new designation. It covers previously developed land and other land that does not strongly contribute to three of the five Green Belt purposes.

Read article →
Seasonal Calendar7 min read

Housing Delivery Test publication and what it triggers

The Housing Delivery Test measurement triggers an action plan below 95 per cent, a 20 per cent supply buffer below 85 per cent and the presumption in favour of sustainable development below 75 per cent.

Read article →
Fire, Structural and Basements7 min read

Which buildings are relevant buildings at Gateway One

Gateway One applies to buildings containing two or more dwellings or educational accommodation that reach 18 metres or seven storeys. Both limbs must be met, and the height is taken to the top occupied floor finish.

Read article →
Daylight, Sunlight and Amenity7 min read

Assessing daylight to a window serving two rooms

Where one window serves a combined kitchen, dining and living space, the assessment treats it as a single room and applies the most demanding illuminance target of the three uses.

Read article →
Use Classes and Change of Use7 min read

Ancillary use and when it becomes a use of its own

An ancillary use needs no permission of its own while it serves the primary use of the planning unit. The analysis turns on the unit of occupation, the functional link and the point at which scale changes the character of the use.

Read article →
Residential Scale Thresholds7 min read

Affordable housing at ten units and the rural option

Affordable housing contributions are not sought below major development, meaning 10 dwellings or 0.5 hectares. In designated rural areas under the Housing Act 1985 a plan may set a threshold of five units or fewer.

Read article →
Comparisons6 min read

Statutory nuisance or a planning condition on noise

A planning condition fixes what you may install and when you may operate. Statutory nuisance under the Environmental Protection Act 1990 deals with the noise actually happening. Compliance with one is no defence to the other.

Read article →
Householder Extensions and Conversions7 min read

Outbuildings under Class E and the 2.5 metre rule

Class E of Part 1 caps a garden building at 2.5 metres overall if any part sits within 2 metres of the curtilage boundary. Here is how the height, eaves and 50 per cent coverage limits are measured.

Read article →
Which Reports Do I Need8 min read

Which reports a change of use to a gym needs

Most gyms fall inside Class E, so the change of use itself often needs no permission. The reports that matter cover structure-borne impact noise, plant noise, hours of use and parking at peak times.

Read article →
Comparisons8 min read

Protected species licence or a class licence: which route

Both routes derogate from the same offences and need the same three tests. The difference is who holds the licence and how fast it moves, and class licences only cover specified low-impact situations.

Read article →
Householder Extensions and Conversions8 min read

Side infill extensions between the bay and the boundary

A side infill is usually permitted development if it stays single storey, within half the width of the original house, and under three metre eaves at the boundary. The roof is what usually fails.

Read article →
Which Reports Do I Need9 min read

Report bundle for a new care home on a settlement edge

A care home is a Class C2 residential institution, so the evidence base is not a housing one relabelled. Need, shift-based transport, assisted evacuation and greenfield ecology do most of the work.

Read article →
Planning Law Updates7 min read

Planning fee indexation and how fees now change

Fees are national, not local, and since 1 April 2025 they move once a year with inflation. The figure is fixed by the date the application is made, so an old estimate will be wrong.

Read article →
Seasonal Calendar8 min read

Timing a submission around the planning committee cycle

The date that matters is the agenda publication deadline, and the officer report deadline before that. Work backwards from the committee meeting you want and the submission date falls out of it.

Read article →
Daylight, Sunlight and Amenity8 min read

Mirror massing and the notional compliant envelope

Where absolute daylight values are unachievable, a comparison against a notional envelope can explain the result. It is also the most abused technique in daylight evidence.

Read article →
Use Classes and Change of Use8 min read

Retail to residential after Class M and Class MA

Most shops are now Class E, so Class MA is the route rather than Class M. Two years of continuous use, adequate natural light and the shopfront application are what decide these schemes.

Read article →
Professionals and Qualifications7 min read

Checking an agent's accreditation before appointment

No register, no licensing and no protected title, so verification is the client's job. Fifteen minutes of checking tells you whether there is a qualification, insurance and a usable complaints route.

Read article →
Data Tools How-To8 min read

Finding trip rate data and using it defensibly

The output is only as good as the site selection. Record the land use category, the filters, the included sites and the reason for every exclusion, then offer a sensitivity test.

Read article →
Residential Scale Thresholds8 min read

One hundred and fifty units and Active Travel England

The residential trigger is 150 units, with further triggers at 7,500 square metres of floorspace and 5 hectares of site area. Here is what the consultee looks at and what answers it.

Read article →
Comparisons8 min read

Build over agreement or land drainage consent

A build over agreement covers public sewers and comes from the water company. Land drainage consent covers ordinary watercourses and comes from the lead local flood authority, with a two month deemed consent.

Read article →
Refusals and Appeals8 min read

Refusal for inadequate daylight to the proposed flats

Poor daylight inside your own units is a design fault measured against housing quality standards. Room depth, window head height and balcony geometry are the levers that actually move the result.

Read article →
Which Reports Do I Need9 min read

Report bundle for a solar array on agricultural land

A field-scale solar scheme is major development on site area alone. Land classification, landscape and visual assessment, glint and glare and biodiversity net gain usually decide it.

Read article →
Report Deep Dives7 min read

Archaeology evidence on a site already disturbed

Previous development reduces archaeological potential without removing it. The assessment has to show how deep the truncation went, across how much of the footprint, and what survives beneath.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope