Comparisons articles – page 11

263 articles
Comparisons7 min read

Lawful development certificate: existing or proposed use

A section 191 certificate confirms that something already happening is lawful. A section 192 certificate confirms that a proposal would be. Here is how the evidence, burden of proof, fees and failure modes differ between them.

Read article →
Comparisons7 min read

Outline permission or full planning permission

Outline permission establishes the principle of development and defers reserved matters; full permission approves a specific scheme ready to build. Here is how the statutory time limits, evidence requirements and costs differ.

Read article →
Comparisons8 min read

Contamination Phase 1 or Phase 2: what triggers the dig

Phase 1 asks whether a source, a pathway and a receptor connect. If they plausibly do, Phase 2 goes into the ground. The trigger decides a five-figure cost.

Read article →
Comparisons7 min read

LVIA or Townscape and Visual Impact Assessment

Landscape and townscape assessments share one methodology and differ in four places: the baseline, the receptors, how viewpoints get agreed, and what cumulative means.

Read article →
Comparisons7 min read

Travel Plan or Transport Statement: what each secures

One document argues your scheme works on the network. The other binds the occupier to mode share targets, surveys and monitoring fees long after the last unit sells.

Read article →
Comparisons6 min read

Construction Management Plan or Construction Traffic Plan

A traffic plan answers the highway authority, a management plan answers environmental health. What goes in each, and the four checks that stop them contradicting each other.

Read article →
Comparisons6 min read

Whole Life Carbon or Circular Economy Statement

A whole life carbon assessment counts emissions by module. A circular economy statement tracks material flows and diversion. Where they share a bill of materials and where they diverge.

Read article →
Comparisons7 min read

Energy Statement or Sustainability Statement: which is which

An Energy Statement proves a number against the Part L baseline. A Sustainability Statement answers adopted policy. Where the line falls and how to keep one set of figures across the pack.

Read article →
Comparisons6 min read

Daylight and Sunlight Assessment or Overshadowing Study

A daylight and sunlight assessment tests neighbouring windows. An overshadowing study tests gardens and amenity space on 21 March. They answer different complaints.

Read article →
Comparisons6 min read

Biodiversity net gain or habitats regulations assessment

One regime measures habitat units and asks for 10 per cent more. The other asks whether a designated site would be harmed, and refuses permission if doubt remains. They are not interchangeable.

Read article →
Comparisons7 min read

Article 4 direction or a condition removing PD rights

Both close the permitted development route, but only one is mapped, consulted on and capable of attracting compensation. The differences decide which search picks it up before you buy.

Read article →
Comparisons7 min read

Party wall notice or planning permission

A planning permission does not let you cut into a shared wall or dig beside a neighbour's foundations. What the Party Wall etc. Act 1996 requires, and how its timetable fits around an application.

Read article →
Comparisons7 min read

Building Regulations or planning permission: what differs

Planning permission and building regulations approval are separate legal systems with separate applications and separate penalties. What each one controls, where they overlap, and the order to do them in.

Read article →
Comparisons7 min read

Listed building consent or conservation area rules

Listing protects one building inside and out. A conservation area protects the appearance of a whole area through the planning system. The two controls, the consents they need and the offences they create.

Read article →
Comparisons7 min read

Retail sequential test or retail impact assessment

Both tests apply to out of centre retail and both can refuse a scheme. Here is what each asks, what evidence it needs and where they diverge.

Read article →
Comparisons6 min read

Sequential Test or Exception Test for flood risk

Two flood tests, in a fixed order. Here is what triggers the exception test, what its two limbs require, and why each test usually fails.

Read article →
Comparisons6 min read

Prior approval or full planning permission

Prior approval narrows what a council may consider and runs on a fixed clock. Here is where that helps a landlord, and where a full application is safer.

Read article →
Comparisons6 min read

Outline permission or permission in principle

One is a permission with matters reserved. The other establishes location, use and amount and nothing else. The difference decides what a lender treats as a consented site.

Read article →
Comparisons7 min read

Section 73 or section 96A: which amendment route

The difference sounds procedural and it is why most amendment decisions go wrong. A section 73 permission arrives with fresh conditions, a new levy calculation and no obligation attached.

Read article →
Comparisons7 min read

Preliminary ecological appraisal or protected species survey

One is a desk study and a walkover that grades potential. The other is seasonal fieldwork by a licensed ecologist. Commission them in the wrong order and a self-build programme loses a season.

Read article →
Comparisons6 min read

Heritage Statement or Archaeological Desk-Based Assessment

One assesses significance and harm to what stands above ground. The other assesses the potential for what lies beneath it. Different authors, different standards, often both.

Read article →
Comparisons6 min read

Planning Statement or Design and Access Statement

One is required by statute for defined applications, the other is asked for by validation lists. Splitting the content properly stops the two documents contradicting each other.

Read article →
Comparisons6 min read

Transport Statement or Transport Assessment: which one

The difference between the two documents is depth, not subject matter. Here is how the thresholds work, what scoping with the highway authority should settle, and where budgets go wrong.

Read article →