Articles – page 249

9163 articles
Transport, Highways and Parking7 min read

Travel plan monitoring surveys and remedies

Most travel plans fail at monitoring because the survey cannot be compared with the baseline. Survey design, response rates, remedies and closing out.

Read article →
Constraints and Designations7 min read

Protected views and viewing corridors in decision taking

A designated view is geometry before it is judgement. Corridors, assessment points, verified views and the cumulative baseline that decides the answer.

Read article →
Data Tools How-To7 min read

Using TRICS data properly in a transport statement

Two consultants can derive trip rates for the same scheme that differ by a factor of two. Site selection, filters, mode share adjustment and the audit trail.

Read article →
Householder Extensions and Conversions8 min read

Extending a bungalow without losing the roofline

On a uniform bungalow estate the roof is the building. What councils look at when a ridge goes up, and the options that avoid the argument.

Read article →
Fire, Structural and Basements7 min read

Firefighting shafts and how they shape a residential core

A firefighting shaft is a stair, lobby, fire main and lift working as one enclosure. How the triggers work and what the shaft does to core planning.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight inside new flats compared with neighbours

A daylight report answers two different questions with two different sets of measures. Where schemes pass one and fail the other, and how officers read the results.

Read article →
Energy, Sustainability and Carbon7 min read

Circular economy statements: what the assessor checks

A reviewer traces every figure in a circular economy statement back to an audit or a drawing. What the targets measure and what counts as evidence.

Read article →
Noise, Air, Odour and Light7 min read

Construction vibration: damage limits and human response

Peak particle velocity thresholds for building damage sit far above the levels at which residents complain. How to predict, monitor and manage the gap.

Read article →
Trees and Arboriculture7 min read

Tree protection barrier specification under BS 5837

What a tree protection barrier has to be built from, where it goes, and the installation and sign-off sequence that discharges a pre-commencement condition.

Read article →
Transport, Highways and Parking7 min read

What Active Travel England looks for in an application

Active Travel England has been a statutory consultee since June 2023. What triggers the consultation, what the assessment scores and how to respond.

Read article →
Constraints and Designations8 min read

Listed building curtilage and what the listing captures

Curtilage decides whether a wall, stable or outbuilding is itself listed. The test, the pre 1948 cut-off and the evidence that settles it.

Read article →
Data Tools How-To7 min read

Checking a site against aerodrome safeguarding maps

Officially safeguarded aerodromes carry deposited maps that trigger statutory consultation on height, cranes, bird attractants and radar. Here is how to check a site and what to submit.

Read article →
Householder Extensions and Conversions8 min read

Wrap around extensions and light to the rooms you keep

A side return and rear extension built together take daylight from the rooms in the middle of the plan. Here is how to design around that, and what the council checks.

Read article →
Constraints and Designations6 min read

Article 4 directions on houses in multiple occupation

Converting a family house to a small shared house is permitted development until a council removes the right. How directions are made, how to check one, and what a C4 application must show.

Read article →
Data Tools How-To6 min read

Reading a CIL charging schedule and instalment policy

The printed rate is not the figure you pay. How zones, indexation, floorspace deductions and the commencement notice decide a levy liability.

Read article →
Data Tools How-To6 min read

Using historic mapping to build a site history

Successive map editions show what stood on a site, what was dug out and what was filled back in. How to build the chronology that drives a conceptual site model.

Read article →
Energy, Sustainability and Carbon6 min read

Future Homes Standard: advising on schemes in progress

A planning permission gives no protection against a Part L uplift. How transitional provisions have operated, and how to design a scheme that works under either standard.

Read article →
Energy, Sustainability and Carbon6 min read

BREEAM credits that depend on the planning decision

Many credits in a BREEAM pre-assessment are not in the design team's gift. Which ones the site and the decision notice control, and how to word the condition.

Read article →
Noise, Air, Odour and Light6 min read

Combining noise, odour and air quality in one submission

Separate consultants produce mitigation that conflicts. Shared receptor schedules, a frozen layout and one coordinated conditions table prevent the holding objection.

Read article →
Noise, Air, Odour and Light7 min read

Restaurant extraction ducts: routes and termination

A kitchen extract duct has to reach roof level through space you have the right to use. How routes, termination height, odour risk and plant noise decide a restaurant application.

Read article →
Transport, Highways and Parking6 min read

Cycle parking: quantity, type and position on a scheme

Meeting the number is the easy part. How stand spacing, store position, cargo cycle space and access routes decide whether cycle parking is accepted.

Read article →
Transport, Highways and Parking6 min read

Getting access onto a classified or trunk road approved

A new access engages the local highway authority, the strategic network operator, or both. What each can do, what evidence they want, and how long it takes.

Read article →
Transport, Highways and Parking6 min read

Section 278 agreements: scope, cost and timing

The agreement that lets a developer build into an existing public highway. What it covers, how technical approval works, what it costs and why it sets the start date.

Read article →
Constraints and Designations6 min read

Archaeological Priority Areas in London and their tiers

London boroughs map archaeological potential in tiered priority areas. What the tier signals, when a desk-based assessment is a validation requirement, and why basements attract the heaviest requirements.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope