Articles – page 303

8954 articles
Viability, Obligations and Commercial7 min read

Late stage viability reviews and how the surplus is split

A late stage review turns a viability argument made at application stage into a payment calculated years later. The clause wording decides how much that payment is.

Read article →
Heritage and Archaeology7 min read

Strip, map and sample: when councils ask for it

Trial trenching rarely ends the archaeological story. Where features are dispersed or their character is unclear, county archaeologists ask for strip, map and sample, and the groundworks programme has to absorb it.

Read article →
Ecology, BNG and Protected Species6 min read

Irreplaceable habitats and why net gain does not apply

The statutory metric cannot value ancient woodland, so net gain does not solve an irreplaceable habitat problem. Avoidance and bespoke compensation are the only routes, and national policy sets a high bar for both.

Read article →
Flood, Drainage and SuDS7 min read

Basements and habitable rooms in flood risk areas

A basement bedroom and a basement plant room are treated completely differently in flood risk policy. The vulnerability classification, not the construction method, decides whether the scheme is arguable.

Read article →
Trees and Arboriculture6 min read

Nesting birds and the practical tree work calendar

The offence relates to a nest in use, not to a date in the calendar. That distinction decides whether a site can be cleared in July and what evidence a contractor needs to hold.

Read article →
Use Classes and Change of Use7 min read

Self storage: which use class and what councils ask for

Self storage normally falls within Class B8, yet the classification argument is rarely what decides these applications. Servicing, visual impact and how you describe the use matter more.

Read article →
Templates, Checklists and Examples7 min read

Listed building consent: the drawings and documents to submit

Listed building consent applications are refused validation more often for missing drawings than for anything else. Here is the pack a conservation officer expects, item by item.

Read article →
Glossary6 min read

Local Development Order and Neighbourhood Development Order

A local development order is made by the council. A neighbourhood development order is made by a community and needs a referendum. Both grant permission in advance.

Read article →
Flood, Drainage and SuDS6 min read

Flood warning and evacuation plans: who writes and approves them

A flood warning and evacuation plan is an emergency planning document, not a hydraulic one. Knowing who approves it saves weeks at determination.

Read article →
Trees and Arboriculture6 min read

Checking trees for bat roost features before felling

A tree with a woodpecker hole or lifting bark may hold a roost. Assessing it properly before felling is a legal obligation, not a courtesy.

Read article →
Use Classes and Change of Use6 min read

Care homes and supported housing: C2 or C3

Extra care, supported living and care homes sit somewhere between C2 and C3. The classification is a question of fact, and it changes what the scheme has to pay.

Read article →
Ecology, BNG and Protected Species6 min read

What goes in a biodiversity gain plan and when it is approved

A biodiversity gain plan is not part of the planning application. It comes after permission, before any work starts, and the council has to approve it.

Read article →
Templates, Checklists and Examples6 min read

Measuring gross internal area against the space standard

Gross internal area decides whether a unit passes the space standard. Stairs, sloping ceilings and built-in storage are where schemes gain and lose square metres.

Read article →
Trees and Arboriculture6 min read

Sequencing tree conditions on a development site

Tree conditions have a sequence, and most of it happens before anything is built. Getting the order wrong turns a discharge application into an enforcement conversation.

Read article →
Glossary6 min read

Conservation covenant: what it is and who holds it

Conservation covenants bind successors in title without needing a planning permission behind them. For habitat banks and off-site gain they are now a standard tool.

Read article →
Flood, Drainage and SuDS6 min read

Critical drainage areas and what changes inside one

A critical drainage area lowers the threshold at which a flood risk assessment is required and tightens discharge rates. Most applicants find out at validation.

Read article →
Use Classes and Change of Use6 min read

Retail to residential above a shop

Upper floors above a shop are often part of the shop's planning unit rather than separate. That single point decides which application you make.

Read article →
Ecology, BNG and Protected Species6 min read

Swift bricks, bat boxes and biodiversity conditions

Enhancement conditions ask for integral nest bricks and bat boxes on most new housing. Placement, orientation and cavity detailing decide whether they work.

Read article →
Templates, Checklists and Examples6 min read

Energy Statement structure using the energy hierarchy

An energy statement that follows the hierarchy reports a carbon figure at every stage. Here is the structure officers expect and the tables that go with it.

Read article →
Glossary6 min read

Abandonment of a planning use

A use that stops for long enough can be abandoned, and resuming it then needs planning permission. Four factors decide it, and none of them is decisive alone.

Read article →
Flood, Drainage and SuDS6 min read

Attenuation storage, interception and half drain time

Discharge rate and storage volume are separate calculations. This is how interception, long term storage and half drain time change the volume a site has to hold.

Read article →
Constraints and Designations6 min read

Protected vistas and how they constrain building height

Protected vistas turn a view into geometry. Where a site sits inside a viewing corridor, the height ceiling is set by a plane rather than by policy argument.

Read article →
Trees and Arboriculture6 min read

Objecting to a new tree preservation order

A provisional tree preservation order binds you from the day it is made. Objections must arrive within the period stated in the notice, and only some arguments carry weight.

Read article →
Use Classes and Change of Use6 min read

Offices to laboratories within Class E

Moving from offices to laboratory space is usually a movement within Class E and needs no planning permission. The external plant, the servicing and the containment level are the real questions.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope