Which Reports Do I Need6 min read

Which reports a children's nursery change of use needs

Nurseries sit in Class E(f), so many changes of use need no permission at all. Where one is needed, drop off, outdoor play noise and highway safety decide it.

Read article →
Report Deep Dives6 min read

Fire Safety Strategy: the BS 9991 report structure

A BS 9991 strategy is a fire engineering document, not a planning fire statement. Here is what sits in each section and what a reviewer should test.

Read article →
Planning Law Updates6 min read

Environmental Outcomes Reports: the proposed EIA replacement

Environmental outcomes reports are enabling powers, not law in force. Scope to the 2017 EIA Regulations, and build an evidence base that reports against outcomes too.

Read article →
Professionals and Qualifications6 min read

Checking an ecologist's licence before you appoint them

Protected species licences are personal, species-specific and time-limited. Ten minutes of checking protects the one thing that cannot be fixed later.

Read article →
Fire, Structural and Basements6 min read

Piling, vibration and neighbouring structures

The vibration levels that annoy neighbours are far below the levels that damage buildings. Method, hours and monitoring are what planning conditions actually control.

Read article →
Daylight, Sunlight and Amenity7 min read

Balconies and overhangs: the light they take from below

A balcony above a window removes sky from the part of the hemisphere that matters most. Here is how to model it, and which design levers recover the loss.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a telecoms mast prior approval under Part 16

An illustrative walkthrough of a 20 metre monopole through Part 16 prior approval, from the ICNIRP declaration to the 56 day deadline and the conditions imposed.

Read article →
Refusals and Appeals7 min read

Section 73 refusals and the limits of varying conditions

Section 73 varies conditions, not the description of development. That single limit explains most refusals, and knowing it before you apply saves a fee and eight weeks.

Read article →
Which Reports Do I Need7 min read

The report pack for a 150 home planning application

At 150 homes a scheme crosses nearly every English planning threshold at once. Here is the evidence base it needs and the order to commission it in.

Read article →
Report Deep Dives7 min read

TVIA viewpoint schedules: agreeing views and reporting effects

The viewpoint schedule decides most of the argument in a townscape and visual impact assessment. Agree it with the case officer before the photography is booked.

Read article →
Which Reports Do I Need7 min read

What changes in the report pack at ten dwellings

Nine dwellings is minor, ten is major. What that changes in the document pack, the determination period, the publicity regime and the drainage evidence expected.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: an equestrian change of use with an arena

Grazing is agriculture; keeping horses is not. An illustrative walkthrough of an arena application, from the use class question to the curfew and the commercial conditions.

Read article →
Planning Law Updates7 min read

The Infrastructure Levy powers and what happens to CIL

The Levelling-up and Regeneration Act created the framework for an Infrastructure Levy and left the detail to regulations. What that means for appraising a site under two regimes.

Read article →
Report Deep Dives7 min read

Historic Building Recording: what each of the four levels contains

The four recording levels differ in the kind of record produced, not just the effort. What Levels 1 to 4 contain, and how to get a recording condition discharged.

Read article →
Refusals and Appeals7 min read

Free go resubmission or appeal: choosing between them

The fee regulations waive the fee on one resubmission within 12 months. When that is the right route, when to appeal instead, and why the appeal deadline does not pause.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a farm shop and cafe on a working holding

A farm shop application is decided on the lane rather than the principle. An illustrative walkthrough from access survey to the produce condition and year one in practice.

Read article →
Refusals and Appeals7 min read

Unilateral undertakings when a section 106 is refused

A unilateral undertaking lets an appellant put an obligation before an inspector without the council signing anything. What it has to contain and when it has to arrive.

Read article →
Fire, Structural and Basements7 min read

Structural condition as an argument for demolition

Condition arguments for demolition usually fail on the same points. What an engineer has to do, how repair schedules are scrutinised, and why marketing evidence matters.

Read article →
Daylight, Sunlight and Amenity7 min read

Modelling neighbouring rooms when access is refused

Assumed internal layouts are normal in daylight work. The professional question is how to assume defensibly, record the basis and test whether the assumption changes the answer.

Read article →
Which Reports Do I Need7 min read

Documents for a five dwelling scheme on a village edge

Five dwellings sits under the major development threshold, which shortens the list but not the survey programme. What a village edge scheme needs and the order to commission it.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: an outbuilding query settled by a certificate

A council enquiry about a garden room, answered with measurements rather than assertions. The Class E limits, the curtilage calculation trap and what a certificate actually protects.

Read article →
Planning Law Updates7 min read

Section 73B: the new route for varying a permission

Section 73 cannot change the description of development. Section 73B was inserted to fill that gap, subject to a substantially different test and to being brought into force.

Read article →
Fire, Structural and Basements7 min read

Means of escape and the loft conversion drawing

Adding a loft room turns a two storey house into a three storey one, and the escape rules change at that point. What that does to the stair, the landing and the rooflights.

Read article →
Report Deep Dives7 min read

Archaeological Field Evaluation: the report structure

An evaluation report exists to say what is under the site, how important it is and what has to happen next. How the sections fit together and where weak reports go quiet.

Read article →