Articles – page 327

8754 articles
Permitted Development6 min read

Why flats and maisonettes have no Part 1 permitted development

Permitted development for flats is far narrower than for houses, because Part 1 of the GPDO applies only to a dwellinghouse. Here is what that leaves, and where Part 20 helps.

Read article →
Residential Scale Thresholds6 min read

Planning application fees by unit count and floorspace

Planning fees are set by regulations and banded by dwellings, floorspace or site area. Here is how the bands work, what is exempt and where to find the current figures.

Read article →
Planning Law Updates6 min read

Infrastructure Levy powers and how they differ from CIL

The Infrastructure Levy sits on the statute book as a set of powers that need regulations before anything changes. Here is how it was designed, and what developers pay in the meantime.

Read article →
Daylight, Sunlight and Amenity6 min read

How councils apply the BRE daylight and sunlight guidance

The BRE guide sets numerical guidelines that councils treat as a starting point rather than a pass mark. Here is how officers use them and how to present an assessment they can follow.

Read article →
Energy, Sustainability and Carbon6 min read

Energy statements for minor residential schemes

Small residential schemes are increasingly asked for an energy statement at validation. Here is what the document has to prove, and how to write it from SAP output.

Read article →
Noise, Air, Odour and Light6 min read

Applying for permission inside an Air Quality Management Area

An AQMA declaration does not block development, but it changes what the council asks for. Here is how screening works, what mitigation is accepted and how it gets conditioned.

Read article →
Heritage and Archaeology6 min read

Searching a Historic Environment Record before you apply

The Historic Environment Record holds the local archaeological and heritage data that national lists do not. Here is how to request a search and what to do with the results.

Read article →
Flood, Drainage and SuDS6 min read

Flood risk activity permits for works near a main river

A flood risk activity permit sits alongside planning permission, not inside it. Here is which works trigger one, the byelaw distances that matter and how to design the requirement out.

Read article →
Permitted Development6 min read

EV charge points under Part 2 Classes D and E

Most home EV chargers do not need planning permission, because Classes D and E of Part 2 of the GPDO cover them. The limits that catch people out are the 2 metre highway rule and listed building curtilage.

Read article →
Residential Scale Thresholds6 min read

Planning determination periods by scheme size

The statutory period for deciding a planning application depends on whether the scheme is major, EIA development or neither. Here is how the clock runs and how to programme around it.

Read article →
Rural and Agricultural7 min read

Field to garden: extending a curtilage in the countryside

Enclosing a paddock or field as domestic garden is a material change of use under section 55 of the Town and Country Planning Act 1990. Here is what the council will look at and what to submit.

Read article →
Rural and Agricultural7 min read

Landscape and visual evidence for a countryside application

Landscape and visual work fails when it answers the wrong question. Choose viewpoints that address the objections, separate landscape effects from visual effects, and be honest about how long planting takes.

Read article →
Planning Law Updates7 min read

Street votes: the power and what it would allow

Street vote development orders would let residents of a single street grant themselves planning permission for agreed forms of development, subject to examination and a referendum.

Read article →
Noise, Air, Odour and Light7 min read

Assessing a heat pump after a neighbour complains

A complaint about an installed heat pump raises two separate questions: was the installation permitted development, and is it a statutory nuisance. The answers are found in different places.

Read article →
Heritage and Archaeology7 min read

Watching briefs and archaeological conditions on small sites

A watching brief means an archaeologist attends your groundworks. It is the proportionate answer on most small sites, and the programme risk is manageable if you plan for it.

Read article →
Flood, Drainage and SuDS8 min read

Ordinary watercourse consent: when planning is not enough

Building a culvert or an outfall in a ditch needs consent under the Land Drainage Act 1991, from the lead local flood authority. Planning permission does not authorise it, and building first is an enforcement risk.

Read article →
Constraints and Designations7 min read

Sites of Special Scientific Interest: consent inside the boundary

Owning land inside an SSSI brings a separate consent regime under the Wildlife and Countryside Act 1981. Routine farming operations on the notified list need Natural England's written consent.

Read article →
Permitted Development8 min read

Class MA prior approval: the use history and natural light tests

Two things sink most Class MA notifications: an unproven qualifying use history and habitable rooms without adequate natural light. Both are fixable before you apply.

Read article →
Residential Scale Thresholds7 min read

Fire Statement thresholds for residential schemes

A Fire Statement is a validation requirement, not a supporting document. If your building is a relevant building under Article 9A, the application is invalid without one.

Read article →
Rural and Agricultural7 min read

Class Q or a full application for a barn conversion

Class Q is faster and narrower. A full application is slower, costs more in evidence and carries mandatory biodiversity net gain, but it lets you design the building the barn deserves.

Read article →
Planning Law Updates7 min read

Enforcement time limits under the 2023 Act

The Levelling-up and Regeneration Act 2023 moved enforcement immunity in England to a single ten year period. Which rule applies to your client depends on when the breach happened.

Read article →
Noise, Air, Odour and Light7 min read

How councils word plant noise conditions and why

A plant noise condition set below background sounds reasonable until the second unit is installed. The wording you agree before the decision decides whether you can ever discharge it.

Read article →
Heritage and Archaeology7 min read

Replacement windows in a listed building

Windows carry a large share of a listed building's interest, so consent starts from repair. Secondary glazing is the usual answer, and slim double glazing succeeds only on the right building.

Read article →
Flood, Drainage and SuDS7 min read

Foul drainage on unsewered sites: package plants and permits

On a site with no mains sewer, the drainage answer has to satisfy building regulations, the general binding rules and the planning officer. Percolation testing is the step that decides most of it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope