Articles – page 326

8763 articles
Noise, Air, Odour and Light7 min read

Odour assessment for a hot food takeaway

Odour is the ground applicants control most directly on a takeaway application. Here is how the control level is reached, what the filtration train looks like and where discharge points fail.

Read article →
Heritage and Archaeology7 min read

Registered parks and gardens: the consultation trigger

There is no registered park consent. What registration brings is designated heritage asset status and a statutory consultation that catches development in the setting as well as the site.

Read article →
Flood, Drainage and SuDS6 min read

Schedule 3 SuDS approval: where the law stands and what to do now

No SuDS Approving Body exists in England and the automatic right to connect survives. Here is what actually controls drainage design now, and what changes if Schedule 3 is brought into force.

Read article →
Residential Scale Thresholds7 min read

Play space and child yield thresholds

Two schemes of the same size can attract very different play space obligations. Here is how child yield is calculated, what counts as playable space and how maintenance gets secured.

Read article →
Planning Law Updates7 min read

Class MA after the removal of the size and vacancy limits

A whole commercial building can now convert to housing under Class MA while still occupied. The two year use test, natural light and the levy in-use rule are what decide schemes now.

Read article →
Daylight, Sunlight and Amenity6 min read

Overshadowing studies: what an officer expects to see

Shadow plots, sun hours plots and a table of sunlit areas, built on a model that includes the fences. Here is what an overshadowing study should contain and where they go wrong.

Read article →
Energy, Sustainability and Carbon6 min read

Circular economy statements and what they require

Material flows, not principles. Here is what a Circular Economy Statement has to demonstrate, how the bill of materials is built, and how it differs from a site waste plan.

Read article →
Noise, Air, Odour and Light7 min read

Diffusion tube monitoring for a planning application

Diffusion tubes are simple to deploy and easy to misuse. Relevant exposure, bias adjustment and annualisation are the steps that make monitoring data usable in an air quality assessment.

Read article →
Heritage and Archaeology6 min read

Listed building enforcement and the criminal offence

Section 9 of the 1990 Act makes unconsented works to a listed building an offence regardless of intent, and listed building enforcement notices are not time limited.

Read article →
Flood, Drainage and SuDS6 min read

Water neutrality: what applicants have to show in affected areas

In affected water resource zones a scheme has to cut per person water demand and offset what is left, with the offset secured before permission can be granted.

Read article →
Residential Scale Thresholds7 min read

Nutrient neutrality and the schemes it catches

Geography and overnight population decide whether nutrient neutrality applies, not scheme size. Here is what gets caught, what goes into a nutrient budget and how mitigation is secured.

Read article →
Planning Law Updates7 min read

The 2020 Use Classes reform and what it actually changed

The September 2020 reform created Class E, F1 and F2 and pushed pubs, takeaways and cinemas into sui generis. Two things survive it: restrictive conditions and the sui generis list.

Read article →
Daylight, Sunlight and Amenity6 min read

The two hour sunlight test for gardens and amenity space

The BRE garden sunlight test is short: half the area, two hours, 21 March, and a 0.8 factor for the change. Here is how it is modelled and how to design a scheme that passes.

Read article →
Energy, Sustainability and Carbon7 min read

Whole life carbon assessment scope under the RICS standard

Upfront, embodied and whole life carbon are three different totals. Here is how the RICS standard scopes them, and the four alignment errors that get assessments sent back.

Read article →
Noise, Air, Odour and Light7 min read

Construction dust risk assessment under IAQM guidance

Screening distances, dust emission magnitude, area sensitivity and risk categories: the IAQM construction dust method, and how the mitigation ends up in planning conditions.

Read article →
Heritage and Archaeology7 min read

Shopfronts in conservation areas: consent and evidence

Permitted development does not cover shop front alterations, and conservation area duties raise the bar. Here is the consent trio, the recurring refusal reasons and the evidence pack that gets a decision.

Read article →
Flood, Drainage and SuDS7 min read

Basement development and flood risk: the tests to satisfy

The flood risk vulnerability class decides most basement schemes before any modelling starts. Here is how the Sequential Test, the Exception Test and groundwater evidence fit together.

Read article →
Permitted Development7 min read

Part 4 Class A: site huts and temporary construction buildings

Site compounds are permitted development under Part 4 Class A of the GPDO, but only while the operations run, only on the site or land sharing a boundary, and only once the operations have permission.

Read article →
Residential Scale Thresholds7 min read

Nationally described space standard: when it applies

Minimum floor areas, bedroom sizes and storage for new homes in England only bite where a council has adopted the standard in its local plan, or where permitted development carries it as a condition.

Read article →
Planning Law Updates6 min read

Planning Gateway One and the Fire Statement requirement

Gateway One brings fire safety into the planning application for taller residential buildings. Here is which schemes are caught and what the Fire Statement must cover.

Read article →
Daylight, Sunlight and Amenity6 min read

Annual probable sunlight hours explained

Annual probable sunlight hours is the measure councils use to judge loss of sunlight to a neighbouring window. Here is what it counts and which windows it applies to.

Read article →
Energy, Sustainability and Carbon7 min read

Designing now for the Future Homes Standard

The Future Homes Standard changes the heating and fabric decisions taken years before completion. Here is what to lock in now and what to leave flexible.

Read article →
Noise, Air, Odour and Light6 min read

Damage cost contributions for air quality mitigation

Damage cost contributions turn tonnes of pollutant into pounds. Here is how the calculation works, where councils apply it correctly, and how to test a request that looks like a tariff.

Read article →
Heritage and Archaeology6 min read

Demolition in a conservation area: when permission is needed

Conservation area consent was replaced in 2013 by a requirement for planning permission for relevant demolition. Here is what that covers, what is excluded and what the application needs.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope