Articles – page 95

9475 articles
Comparisons7 min read

Flood sequential test or retail sequential test

One asks whether the development could sit on land at lower flood risk. The other asks whether it could sit in a town centre. They can point in opposite directions on the same site.

Read article →
Glossary7 min read

Volumetric run-off coefficient in drainage design

The coefficient converts rainfall depth into run-off volume, and volume is a different question from peak rate. Confusing the two produces a system that passes the discharge check and floods anyway.

Read article →
Daylight, Sunlight and Amenity7 min read

A side extension facing a blank flank wall

A blank flank wall has no window to assess and no right of light to lose. The objections that survive are the terracing effect, the rainwater detail at the boundary and the light in your own rooms.

Read article →
Fire, Structural and Basements6 min read

Fire and structural evidence for a basement storey

A basement has no ground level window to climb out of, and digging beneath a house removes the support its foundations rely on. Those two facts drive every requirement.

Read article →
Flood, Drainage and SuDS7 min read

Detention basins designed as usable landscape

A basin that counts towards an open space requirement and one that appears as a fenced hollow are the same feature designed differently. Slopes, depth and inundation frequency decide which you get.

Read article →
Professionals and Qualifications6 min read

Reviewing an AI drafted report as the named professional

Signing a draft makes you the author for professional purposes. The checks that decide your exposure are policy editions, traceable site facts and the gaps a draft filled instead of flagging.

Read article →
Constraints and Designations6 min read

Peat soils and the policy against disturbance

Drained peat oxidises and keeps releasing carbon long after the works finish. The first questions on a peat site are how deep it goes and what the scheme would do to the water table.

Read article →
Comparisons6 min read

Discharge of conditions or a section 73 application

A discharge application asks whether your details satisfy the condition. Section 73 asks for the condition to change, and creates a new permission that carries the original time limit.

Read article →
Transport, Highways and Parking6 min read

Refuse vehicle access, carry distances and turning heads

The refuse vehicle sets carriageway width, corner radii and turning provision. Test the swept paths and carry distances against the waste service's own guidance before the plots are set out.

Read article →
Heritage and Archaeology6 min read

Dendrochronology and dating evidence for a building

Dendrochronology gives a felling date, not a construction date. Commission it when the date is genuinely disputed and the answer would change the significance argument, because a share of samples return nothing.

Read article →
Daylight, Sunlight and Amenity6 min read

Light to a neighbour's conservatory: how it is treated

A conservatory is normally an addition rather than a main habitable room, and most of its light arrives through the roof. The exceptions are the inner room behind it and a flank wall built close by.

Read article →
Fire, Structural and Basements6 min read

Upward extension: structural adequacy of the host building

Lightweight construction reduces added dead load and does nothing for overturning. Investigate stability first, then vertical capacity, then foundations, because that is the order of difficulty.

Read article →
Flood, Drainage and SuDS7 min read

Swale design: gradients, side slopes and check dams

A swale is mostly geometry. Shallow gradients keep flow slow, gentle side slopes let a machine mow it, and check dams break a steeper fall into shallow steps.

Read article →
Professionals and Qualifications6 min read

Energy and overheating modelling: who holds what

Compliance modelling and dynamic simulation are done by different people with different accreditations. Asking which software and which accreditation is more useful than asking whether they have done one before.

Read article →
Constraints and Designations6 min read

Overhead lines, clearances and undergrounding a plot

Conductor clearance is a safety requirement, not a policy test, so it cannot be argued away. Work out the usable envelope from the operator's corridor first, then design the dwelling into it.

Read article →
Comparisons6 min read

Class MA prior approval or full permission for flats

Class MA grants the change of use and nothing else. The route works when the building passes every eligibility gate and the envelope stays as built; otherwise a full application is the cleaner asset.

Read article →
Transport, Highways and Parking6 min read

Section 278 agreements: scope, bonds and commuted sums

A section 278 agreement is a design and approval process, not paperwork that follows a decision. The three cost heads developers underestimate are check and supervision fees, the bond, and commuted sums.

Read article →
Heritage and Archaeology6 min read

Geophysical survey methods and which suits your site

Magnetometry is fast on chalk and gravel but defeated by made ground and steel fences. Radar finds masonry and fails on clay. Resistance sees both, when the season gives it a moisture contrast.

Read article →
Daylight, Sunlight and Amenity6 min read

A boundary wall raised to two metres and the light lost

Part 2 Class A allows two metres away from a vehicular highway and one metre next to one. That means the wall most likely to take light from a ground floor window is often the one needing no permission.

Read article →
Flood, Drainage and SuDS7 min read

Geocellular storage and designing access for cleaning

Modular cells hold a large volume in a small footprint, but silt that reaches the cells stays there. The maintenance channel and the upstream treatment stage decide whether the design is accepted.

Read article →
Fire, Structural and Basements7 min read

Fire statement content: the plans and the narrative

A Gateway One fire statement answers what planning can determine: layout, appliance access, water supply, the escape strategy in principle and the construction phase. The detailed design belongs at Gateway Two.

Read article →
Professionals and Qualifications6 min read

Who can sign off a structural appraisal for a conversion

No statute names the qualification, but a conversion appraisal carries weight when a chartered engineer has inspected the building, states the limitations and answers the capable of conversion question directly.

Read article →
Constraints and Designations6 min read

High pressure gas mains and building proximity distances

A high pressure gas main brings three separate constraints: the registered easement, the operator's building proximity distance and the HSE consultation zone. Find all three before the layout is drawn.

Read article →
Comparisons7 min read

Conservation area demolition: permission or prior approval

Conservation area consent went in 2013. Demolishing an unlisted building in a conservation area is now relevant demolition needing planning permission, with a criminal offence attached; Part 11 Class B covers the rest.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope