Comparisons articles – page 4

263 articles
Comparisons7 min read

Solar panels under permitted development or an application

Most domestic roof solar is permitted development under Part 14 of the GPDO 2015. The limits that push a scheme into a planning application are narrower than people expect.

Read article →
Comparisons7 min read

Heat pump permitted development or a planning application

Most air source heat pumps go in without an application. The ones that need permission usually fail on the noise calculation or on where the unit has to sit.

Read article →
Comparisons7 min read

Injunction under section 187B or an enforcement notice

An injunction takes the breach out of the planning system and into the courts, where there is no appeal on the merits and non-compliance is contempt.

Read article →
Comparisons6 min read

Appeal against non-determination or wait for a decision

An appeal against non-determination hands your application to an inspector and takes it out of the council's hands. Sometimes that is the right call at week eight. Often it is not.

Read article →
Comparisons6 min read

Planning Performance Agreement or an extension of time

An extension of time postpones the decision date and your right to appeal non-determination. A performance agreement buys sequencing and named officer time. Here is when each is worth it.

Read article →
Comparisons6 min read

Section 106A modification or a fresh planning agreement

A deed of variation is available at any time with no statutory test. A section 106A application waits five years but carries an appeal. Here is how the two compare in practice.

Read article →
Comparisons6 min read

Environmental Statement or preliminary environmental information

Schedule 4 sets what an Environmental Statement must contain and requires competent experts. Preliminary environmental information has no content list and a different job. Here is how to use each.

Read article →
Comparisons6 min read

Neighbourhood plan policy or local plan policy in a decision

A made neighbourhood plan sits in the development plan alongside the local plan. Where the two conflict the later document prevails, and most apparent conflicts are not conflicts at all.

Read article →
Comparisons6 min read

Scheduled monument consent or listed building consent

Scheduled monument consent is decided nationally with no appeal and no materiality threshold. Listed building consent is local and appealable. Here is which regime governs when an asset carries both designations.

Read article →
Comparisons6 min read

Hedgerow removal notice or felling licence: which applies

A field hedge with standard trees can engage two separate consent regimes at once. Here is what each covers, the important hedgerow criteria, the felling exemptions and the timescales for both.

Read article →
Comparisons6 min read

Demolition prior notification or a full planning application

Prior notification of demolition gives the council control over method and restoration only. Here is when the right applies, when conservation area rules take over, and which parallel notices run alongside.

Read article →
Comparisons7 min read

Basement Impact Assessment or a Flood Risk Assessment

A Flood Risk Assessment asks whether water will reach the property. A Basement Impact Assessment asks what your excavation does to groundwater and ground stability. Here is what each covers and which to commission first.

Read article →
Comparisons6 min read

Noise or odour assessment for a restaurant: which you need

Plant noise and cooking odour are assessed by different methods against different standards, even though they leave the building through the same duct. Here is what each report tests and which one your council will ask for.

Read article →
Comparisons6 min read

Prior approval or permission for a large rear extension

A 6 or 8 metre rear extension can avoid a planning application, but only through the prior approval procedure. Here is how that route compares with a householder application.

Read article →
Comparisons6 min read

Lawful development certificate or retrospective application

After unauthorised work there are two routes. One tests dates and evidence, the other tests planning merits and ends in conditions. Here is how the choice actually works.

Read article →
Comparisons7 min read

Parking survey or the adopted parking standard: which wins

Adopted parking standards apply an authority-wide number to every site. An overnight beat survey measures what one street actually holds. Here is when the survey wins and when it will not help.

Read article →
Comparisons7 min read

Water Supply Assessment or Utilities Assessment: which you need

A Water Supply Assessment answers one question about potable water capacity. A Utilities Assessment scopes electricity, gas, water, foul, telecoms and lead times. Here is which one a council asks for and when.

Read article →
Comparisons7 min read

Pre-redevelopment audit or structural survey

One document answers what the building is made of, the other whether it can carry your scheme. Here is what each involves and why the structural work has the earlier deadline.

Read article →
Comparisons7 min read

Vacant building credit or a viability case for fewer homes

The credit is arithmetic, viability is argument. This compares what each achieves, how vacancy and abandonment are tested, what councils challenge, and which to run first.

Read article →
Comparisons7 min read

Design code or a design guide supplementary document

A design code in the development plan engages the section 38(6) presumption. A design guide SPD is only a material consideration. That difference in status decides how each behaves in a decision and at appeal.

Read article →
Comparisons7 min read

Scheduled monument consent or planning permission

Scheduled monument consent comes from the Secretary of State under the Ancient Monuments and Archaeological Areas Act 1979. Planning permission comes from the council. Neither authorises what the other controls.

Read article →
Comparisons7 min read

BS 4142 rating level or BS 8233 internal guideline values

BS 4142 produces a relative answer about an industrial or commercial source. BS 8233 sets absolute internal targets for dwellings. Most schemes beside a commercial neighbour need both, for different parts of the report.

Read article →
Comparisons7 min read

Committee determination or a delegated decision

Whether an application is decided by an officer or by elected members turns on one published document, the council's scheme of delegation. Here is how to read it, and how the call-in and speaking deadlines work.

Read article →
Comparisons7 min read

Asset of community value or local heritage listing

Community value listing buys time to bid when a building is sold. Local heritage listing gives it weight when an application arrives. Different tests, different teams, and no conflict in doing both.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope