Articles – page 115

9439 articles
Ecology, BNG and Protected Species8 min read

The degradation rule and your biodiversity net gain baseline

Schedule 7A to the Town and Country Planning Act 1990 reverts the pre-development biodiversity value to its pre-clearance level where habitat was degraded after 30 January 2020.

Read article →
Flood, Drainage and SuDS8 min read

SuDS adoption and the management company question

No body is obliged to adopt a surface SuDS feature in England, so most end up with a management company. Settle the component-by-component position before the layout is fixed.

Read article →
Scenario Walkthroughs8 min read

Listed barn to a dwelling: a full application walkthrough

An illustrative walkthrough of a listed threshing barn converted to one dwelling, where curtilage listing closed off Class Q and bat licensing set the programme.

Read article →
Residential Scale Thresholds8 min read

Thresholds that trigger a viability review mechanism

A review mechanism follows a shortfall justified by a viability assessment rather than a unit count. The drafting of the implementation definition, the trigger proportion and the fixed inputs decides the eventual payment.

Read article →
London7 min read

Industrial capacity in London: measuring no net loss

A London scheme can add industrial floorspace and still lose capacity once clear height, yard depth, vehicle access and permitted hours are counted. Here is how to measure and evidence all five.

Read article →
Glossary7 min read

Chargeable development under the Community Infrastructure Levy

Chargeable development is the net new floorspace the levy actually bites on. The in-use test for existing buildings and the order in which notices are served decide most liabilities.

Read article →
Energy, Sustainability and Carbon8 min read

Making the retrofit first case in a planning statement

No national policy presumes against demolition, but a planning statement proposing it needs a consistent option appraisal with structural evidence, honest carbon boundaries and a deliverability case.

Read article →
Noise, Air, Odour and Light8 min read

Statutory nuisance and why a condition is not a substitute

Statutory nuisance and planning conditions are separate regimes run by separate teams. Permission is no defence to a nuisance, and a clear numerical condition is usually faster to enforce.

Read article →
Trees and Arboriculture8 min read

How a hedgerow unit is counted for biodiversity net gain

The hedgerow module of the statutory metric works in kilometres, needs its own 10 per cent gain, and treats a line of three trees differently from a single tree in a lawn.

Read article →
Viability, Obligations and Commercial8 min read

Phasing a scheme to manage section 106 triggers

Phasing moves when obligations fall due rather than how much they total. Define phases by land parcel, build in a revised phasing plan mechanism, and tie affordable delivery to occupation within each phase.

Read article →
Heritage and Archaeology8 min read

Solar panels and heat pumps on a listed building

Solar panels and heat pumps on a listed building need consent whenever they affect special interest, even where permitted development covers the planning side. Position, fixings and reversibility decide most cases.

Read article →
Ecology, BNG and Protected Species8 min read

Biodiversity net gain unit types: three separate tests

The statutory biodiversity metric reports area habitat, hedgerow and watercourse units separately, and each module present in the baseline needs its own 10 per cent gain. Pooled figures get gain plans rejected.

Read article →
Flood, Drainage and SuDS8 min read

Exceedance flow routing when the drainage system fills

Above the 1 in 100 year event, water runs overland. Designing where it goes is a layout and levels exercise, and lead local flood authorities expect to see it drawn rather than described.

Read article →
London7 min read

Daylight and sunlight in a dense London context

BRE 209 targets were derived from suburban layouts. On a dense London site you need alternative targets with a stated derivation, full room-by-room results and an options appraisal that shows the massing was tested.

Read article →
Glossary9 min read

Rating level in a BS 4142 noise assessment

The rating level is the specific sound level of your plant plus a correction for tonality, impulsivity or intermittency, compared against the background sound level to give the excess that drives the conclusion.

Read article →
Scenario Walkthroughs9 min read

Garage court infill: a four unit application walkthrough

An illustrative walkthrough of a four unit infill on a redundant garage court, where refuse vehicle access, 21 metre separation distances, boundary trees and a failed infiltration pit each reshaped the layout.

Read article →
Residential Scale Thresholds8 min read

Planning application publicity requirements by scale

Article 15 of the DMPO 2015 sets a floor for publicity that rises from a site notice or neighbour letter on a minor application to a press advert for majors and a 30 day period for EIA development.

Read article →
London6 min read

Play space in London: child yield and the area target

London expects at least 10 square metres of playable space per child, with the child population derived from the unit mix. The distance thresholds decide the layout.

Read article →
Use Classes and Change of Use7 min read

Cinemas, theatres and live music venues

Cinemas, concert halls, theatres and live music venues sit outside the use classes, so every change of use needs permission. Agent of change decides what happens when housing arrives next door.

Read article →
Residential Scale Thresholds6 min read

Half a hectare: the site area route to major status

A three house scheme can be major development because of its red line. The site area limbs in the procedure order catch small schemes on large plots.

Read article →
London7 min read

What a Healthy Streets assessment has to cover

Policy T2 of the London Plan asks applicants to show how a scheme supports the ten Healthy Streets indicators. Done early, the assessment changes the layout rather than justifying it.

Read article →
Energy, Sustainability and Carbon7 min read

Battery energy storage: the planning consent route

Standalone battery storage in England is decided by the local planning authority whatever its capacity. Fire safety and noise decide most applications, landscape decides the rest.

Read article →
Noise, Air, Odour and Light7 min read

Mechanical ventilation, noise and overheating in conflict

Internal noise is assessed with windows shut and overheating with them open. Approved Document O makes the conflict explicit, and resolving it is a plan-stage decision.

Read article →
Trees and Arboriculture7 min read

Arboricultural site monitoring during construction

The monitoring schedule is the part of an arboricultural condition that proves the method statement was followed. Hold points, site records, incursions and close-out.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope