Articles – page 216

9222 articles
Templates, Checklists and Examples7 min read

Checklist: pre-application pack for a minor residential scheme

A pre-application pack for a small residential scheme should be thin. The value sits in a numbered list of questions, not in drawings you will have to redo.

Read article →
Project Type Guides7 min read

Planning permission for bin and cycle stores at flats

Flats have no outbuilding permitted development rights, so a roofed forecourt store needs permission. Capacity standards, carry distances and design decide it.

Read article →
Report Deep Dives7 min read

Photomontage standards in a townscape and visual assessment

A verified view is evidence; an unverified montage is an artist's impression. The difference lies in the camera data, the survey control and the stated viewing distance.

Read article →
Which Reports Do I Need8 min read

Documents for a single dwelling in Flood Zone 2

There is no small site exemption in Flood Zone 2. A single dwelling needs a site-specific flood risk assessment whatever the plot size, plus a sequential test that officers routinely reject.

Read article →
Neighbours, Objections and Community7 min read

Taking part in an appeal as an interested party

On a householder appeal the inspector only reads what you sent the council. On other appeals you get a fresh five week window. Knowing which applies is the first step.

Read article →
Use Classes and Change of Use7 min read

Losing a community facility and the policy tests

Applications to redevelop a village hall or local shop turn on marketing, viability and replacement provision. Those tests are evidential, and the evidence can be checked.

Read article →
Professionals and Qualifications7 min read

Heritage consultant competence for a statement of significance

No statute reserves a statement of significance to one profession. These are the registrations, research skills and review checks that separate a usable statement from a paraphrased list entry.

Read article →
Permitted Development8 min read

Permitted development rights on a flat over a shop

Schedule 2 Part 1 of the GPDO applies only to dwellinghouses, and the Order's definition excludes flats. Here is what survives for a flat above a shop.

Read article →
Report Deep Dives7 min read

An illustrative greenfield runoff calculation for a small site

Work the greenfield runoff arithmetic for a third of a hectare and you get about 1.5 litres per second. Here is the calculation, the storage volume it implies, and where the local flood authority overrides it.

Read article →
Fire, Structural and Basements7 min read

Fire evidence for a building just below the threshold

Article 9A only bites at 18 metres or seven storeys. Below that line the duty falls away but the questions do not, so the skill is answering proportionately.

Read article →
Templates, Checklists and Examples7 min read

Worked example: trip rates for a small convenience store

Trip rate selection for a small food store is decided by the filters, not the arithmetic. This worked example shows the query, the rates, the sums and the challenges that follow.

Read article →
Project Type Guides7 min read

Planning permission for a replacement dwelling in the countryside

A replacement dwelling application in open countryside stands or falls on proof that the existing building is lawfully a house and that its residential use was never abandoned.

Read article →
Which Reports Do I Need8 min read

Reports for a place of worship in a warehouse

Converting a storage and distribution unit into a place of worship needs full planning permission. The evidence that decides it is parking, noise and the loss of employment floorspace.

Read article →
Project Type Guides7 min read

Planning permission for caravan storage on farmland

Agricultural permitted development does not cover storage. Here is what a caravan and motorhome storage application on farmland has to evidence.

Read article →
Report Deep Dives7 min read

What an Environment Agency consultee rejects in an FRA

Most Environment Agency objections are about missing information, not unacceptable development. Here is what the officer checks and how to clear a holding objection.

Read article →
Which Reports Do I Need7 min read

Which documents a care home of sixty bedrooms needs

Class C2 changes the assessment, and resident vulnerability changes the evidence. Here is the document set a sixty bedroom care home application usually needs.

Read article →
Templates, Checklists and Examples8 min read

Section outline: travel plan for a primary school

Highway officers read a school travel plan in a set order. Here is that order, with the survey, target and drop-off content each section has to carry.

Read article →
Which Reports Do I Need8 min read

Documents for stables and a menage on a rural holding

Equestrian use falls outside agriculture, so farm permitted development does not apply. Here is the document set for stables, an arena and its floodlighting.

Read article →
Report Deep Dives7 min read

The source characterisation section of an Odour Assessment

A dispersion model can only redistribute what you feed it. Here is how odour sources are identified, quantified and reported so the assessment stands up.

Read article →
Use Classes and Change of Use7 min read

Describing a mixed use correctly on the application form

Draft the description loosely and you grant more than intended; draft it tightly and every change needs a new application. Here is how to get the wording right.

Read article →
Glossary7 min read

Prior notification of demolition and what it covers

The council controls the method of demolition and the restoration of the site, not the principle. Here is what to submit, what is exempt and where it fails.

Read article →
Neighbours, Objections and Community7 min read

Complaining about how a council handled an application

A complaint addresses how an application was handled, not whether the decision was right. Here is the route, the evidence and what the remedies actually are.

Read article →
Professionals and Qualifications7 min read

Choosing an acoustic consultant for a planning noise report

Match the consultant to the standard your application engages, check the instrumentation and calibration, and define what the fixed price actually covers.

Read article →
Permitted Development7 min read

Reading the GPDO without getting lost

Find the class, check whether a limitation kills the right, then read the conditions. A practical method for using the 2015 permitted development order.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope