Articles – page 296

9015 articles
Daylight, Sunlight and Amenity6 min read

Daylight evidence in a neighbour objection: what carries weight

Loss of light is material, loss of a view is not. If a daylight assessment has been submitted, the useful objection interrogates the report rather than repeating the complaint.

Read article →
Energy, Sustainability and Carbon7 min read

Securing energy performance after construction by condition

A condition requiring Part L compliance is unenforceable in planning terms. One tied to the improvement the energy statement promised is not. The difference decides whether it can be discharged.

Read article →
Wales, Scotland and Northern Ireland7 min read

The Welsh language as a material planning consideration

Section 31 of the Planning (Wales) Act 2015 made the Welsh language a material consideration in Welsh planning decisions. Here is when an assessment is needed and what it must cover.

Read article →
Data Tools How-To7 min read

Checking an off-site unit on the biodiversity gain sites register

The register records the land, the habitat values, the securing mechanism and every allocation already made. Reading it properly is the due diligence most off-site unit buyers skip.

Read article →
Residential Scale Thresholds7 min read

Viability evidence and what changes as scheme size grows

A policy compliant scheme needs no viability assessment. Everything after that depends on scale: abnormals, benchmark land value, review mechanisms and who pays for the audit.

Read article →
Which Reports Do I Need7 min read

Which reports a single storey rear extension needs

A single storey rear extension needs drawings, a location plan, an ownership certificate and the fee. The local validation list decides everything else.

Read article →
Fire, Structural and Basements6 min read

Basements and the Party Wall etc. Act alongside planning

Planning permission does not let you start digging. The Party Wall etc. Act runs separately, with its own notices, timescales and costs for a basement project.

Read article →
Daylight, Sunlight and Amenity6 min read

Sunlight to a school playground or nursery outdoor space

Playgrounds are assessed with the same BRE test as gardens, but read differently. Use patterns, term time hours and summer shade all belong in the assessment.

Read article →
Energy, Sustainability and Carbon6 min read

Defending the assumptions inside an energy statement

Reviewers go straight to four assumptions in any energy statement. Here is what they check, why the numbers slip and how sensitivity testing settles the argument early.

Read article →
Wales, Scotland and Northern Ireland6 min read

Developments of National Significance in Wales explained

Defined categories of scheme in Wales are decided by Welsh Ministers rather than the council, with secondary consents handled in the same process. Here is how it runs.

Read article →
Data Tools How-To6 min read

What the statutory biodiversity metric needs before you start

The metric is only as good as the baseline survey behind it. Here are the inputs it needs, the timing that governs them and the errors that fail a review.

Read article →
Residential Scale Thresholds6 min read

Class MA floorspace limits and the conversion threshold

Class MA lost its floorspace cap and vacancy requirement in March 2024. The two-year continuous use test and the prior approval matters are what decide applications now.

Read article →
AI and Planning6 min read

Editing a draft to match a local validation checklist

Most validation failures are administrative. Here is how to map documents to a specific authority's local list, name the files correctly and justify what you leave out.

Read article →
Viability, Obligations and Commercial6 min read

Deeds of variation on a section 73 permission

The original deed often binds only the permission named in it. Here is how to check, which instrument to use, who has to be a party and when it must complete.

Read article →
Fire, Structural and Basements6 min read

Ground movement assessment for a basement, explained

The ground movement section decides a basement application. Here is what the engineer models, how damage categories are assigned and what a monitoring regime should say.

Read article →
Daylight, Sunlight and Amenity6 min read

Privacy and overlooking: justifying separation distances

Separation distances come from council design guides, not from national policy. What matters is whether the privacy relationship is acceptable, and how you evidence it.

Read article →
Energy, Sustainability and Carbon6 min read

Water efficiency standards and how planning secures them

The optional technical standard only applies where local policy justifies it. Here is how the fittings calculation works and how compliance is actually verified.

Read article →
Wales, Scotland and Northern Ireland6 min read

Pre-application consultation for major development in Wales

Statutory pre-application consultation is compulsory for major development in Wales, and the report forms part of a valid application. Here is how to run it properly.

Read article →
Data Tools How-To6 min read

How to check a tree preservation order before you buy

A protected tree changes what you can build and what you can do in the garden. Here is how to establish whether a specific tree is protected, before you commit.

Read article →
Residential Scale Thresholds6 min read

Water and sewerage capacity objections as schemes get larger

Capacity objections rarely refuse a scheme. They turn into occupation conditions and two-year delays, and the time to deal with them is before the layout is fixed.

Read article →
AI and Planning6 min read

Site information a postcode cannot tell you

Designation layers load from a postcode. Levels, ground conditions, title, previous extensions and neighbouring window positions do not, and applications turn on them.

Read article →
Viability, Obligations and Commercial6 min read

Modifying a section 106 obligation after five years

After five years an owner can apply to modify or discharge a planning obligation without the council's agreement. The test is narrow, and viability is not part of it.

Read article →
Fire, Structural and Basements6 min read

Basement impact assessment: the standard four stage structure

Boroughs that require a basement impact assessment expect the same four stage structure. Here is what belongs in each stage and where audits usually stall.

Read article →
Daylight, Sunlight and Amenity6 min read

Wind tunnel testing or computational modelling for a scheme

Both methods report pedestrian wind conditions against the Lawson criteria. Which one an authority will accept depends on height, exposure and what it has asked for in writing.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope